BioheatUSA Wood and Pellet Boilers —
BioheatUSA, formerly Tarm USA, supplies high-efficiency wood and pellet boilers. The three wood-gasification boilers are designed to run at high-fire only—so as to achieve high combustion efficiency…
General Panel Corporation Structural Insulated Panels —
General Panel Corporation produces an EPS-core SIP system. The company offers panels with a EPS core thicknesses of 3-5/8", 5-5/8", 7-3/8", 9-3/8", and 11-3/8" with corresponding R-values of 15, 23,…
Earth Measure Dimension Stone —
Earth Measure, a collaboration between Coldspring and Jason F. McLennan, is a dimension stone product that takes waste from stone manufacturing and cuts it into specific patterns that mimic the…
BlueskinVP Water-Resistive Barrier —
Henry Company’s BlueskinVP house wrap is a water-resistive, vapor-permeable, air barrier membrane that contains a permeable adhesive layer, so it does not require mechanical attachment. BlueskinVP can…
Daikin Altherma —
Daikin’s Altherma is an air-source heat pump system that can provide heating, cooling, and domestic hot water. Altherma is available with split-type or outdoor-only heat pumps along with a “Hydrobox”…
LED Replacement Lamps —
Using LED replacement lamps has the potential to save enormous amounts of energy. Some of these…America's Greenest Office Building
Get Ready for LEED-EBOM with Our Stress Test
Sure, most project teams get points for EAc6: Emissions Reduction Reporting (78% achievement rate in LEED-EBOM 2009). But how ready is your project team for the challenging credits—like EAc3.2, SSc6, and MRc6?
Read more
What does LEED certification cost, credit by credit? "The Cost of LEED" report breaks it down
LEEDuser Forum
Submittal templates in metric Units
in PIf1: Minimum Program Requirements
9:06 AM
RE: Option 3 - Measurement
in Schools 2009 IEQc8.1: Daylight and Views—Daylight
Friday, 10:07 PM
RE: Green Roofs, High Albedo Roofs and U-factor Assembly values
in NC 2009 EAp2: Minimum Energy Performance
Friday, 6:44 PM
When to submit for construction Review
in LEED Reviews: LEED Online, Appeals, Design/Construction Submittals, and more
Friday, 6:35 PM
Meeting 2 Point Prerequisite via EAc1.4 Equipment and Appliances
in NC v2.2 EAp2: Minimum Energy Performance
Friday, 4:42 PM
RE: Gravel
in NC 2009 SSc7.1: Heat Island Effect—Nonroof
Friday, 4:38 PM
infill site
in ND-v2009: Restoration of habitat or wetlands and water bodies
Friday, 2:18 PM
RE: EA Credit 1 - Using available waste oil for heating
in NC 2009 EAc1: Optimize Energy Performance
Friday, 1:16 PM
RE: Golf Courses
in NC 2009 SSc2: Development Density and Community Connectivity
Friday, 11:44 AM
EAp 1 Performance Period
in EBOM 2009 EAp1: Energy Efficiency Best Management Practices—Planning, Documentation and Opportunity Assessment
Friday, 10:56 AM
10 Tips for Passing the LEED Green Associate Exam
Whole-Building Life-Cycle Assessment: Taking the Measure of a Green Building
Why we will never understand the true impact of our buildings—and how we should try to anyway
Flame Retardants Go Under the Microscope —
Flame retardants will be the focus of risk assessments carried out in 2013 by EPA.Seattle School Earns World’s Fourth Living Building Certification —
The science wing of a Seattle elementary school is the fourth project to be certified under the and the first under version 2.0 of the Challenge.New “Top Ten Plus” Award Crowns AIA’s 2013 Green Projects —
This year’s winners continue the theme of social consciousness, while the “plus” awards ultra-low energy consumption.Competition Asks the Public to Redesign Rockaway —
A new design competition seeks innovative proposals from the public for the resilient development of the Sandy-stricken Rockaway Peninsula.Heat-Pump Clothes Dryers Really Work, Study Confirms —
The technology, prevalent in Europe, could be adapted for super-sized American laundry loads.CAFboard Compressed-Straw Panel Is Back —
Using American-made waste straw for wallboard, insulation, and acoustic applications, Stramit USA has brought back CAFboard.“We don’t look at the calculation that’s coming out as exact down to the last gram of carbon that’s been emitted or stored in the building, but it gives us a picture of how it’s performing.”
— Max Richter, of Perkins+Will, on the value of whole-building life-cycle assessment
From Whole-Building Life-Cycle Assessment: Taking the Measure of a Green Building
