ad-100000843
In the fourth bullet, revise the second sentence to read:Reconfiguration of additional existing occupied space that has been constructed with demountable partition systems is permitted. Or design for future vertical expansion on a minimum of 75% of the roof, ensuring that existing operations and service systems will be able to operate at or near capacity during the expansion.
Date:
Wednesday, February 2, 2011
Updated date:
Saturday, February 14, 2015
Internationally Applicable:
Campus Applicable:
Ref Guide Name and Edition Pre-v4: