Optimize Energy Performance: O&M


Click a button for tips and guidance from LEEDuser
LEED for Existing Buildings: Operations & Maintenance EAc1
This is the single most important credit in LEED, as reflected in the number of points available. Projects earn those points based on their Energy Star score, which is derived from their actual energy use during the performance period. Project types that are not elegible for Energy Star earn points based on their percent energy use reduction against a national baseline.

This is an unofficial summary for general information only.


PRODUCTS

By CSI Division, Section