Log in
LEED Pilot Credits
LEED Pilot Credit Library
Materials-Related Pilot Credits
Construction and demolition waste management

LEED CREDIT

Pilot-Credits MRpc69: Construction and demolition waste management 1 point

LEEDuser’s viewpoint

Frank advice from LEED experts

LEED is changing all the time, and every project is unique. Even seasoned professionals can miss a critical detail and lose a credit or even a prerequisite at the last minute. Our expert advice guides our LEEDuser Premium members and saves you valuable time.

Credit language

USGBC logo

© Copyright U.S. Green Building Council, Inc. All rights reserved.

Intent

Pilot Credit Closed
This pilot credit is closed to new registrations
To reduce construction and demolition waste disposed of in landfills and incineration facilities by recovering, reusing, and recycling materials.

Requirements

* This credit language is drawn from the LEED v4 draft. Where other point totals are noted, this pilot credit is worth 1 point in total. *Recycle and/or salvage nonhazardous construction and demolition materials. Calculations can be by weight or volume but must be consistent throughout.

Exclude excavated soil, land-clearing debris from calculations. Include materials destined for alternative daily cover (ADC) in the calculations as waste (not diversion). Include wood waste converted to fuel (bio-fuel) in the calculations; other types of waste-to-energy are not considered diversion for this credit.

However, for projects that cannot meet credit requirements using reuse and recycling methods, waste-to-energy systems may be considered waste diversion if the European Commission Waste Framework Directive 2008/98/EC and Waste Incineration Directive 2000/76/EC are followed and Waste to Energy facilities meet applicable European Committee for Standardization (CEN) EN 303 standards.

Option 1. Diversion (1-2 points)
Path 1. Divert 50% and Three Material Streams (1 point)
Divert at least 50% of the total construction and demolition material; diverted materials must include at least three material streams.

OR

Path 2. Divert 75% and Four Material Streams (2 points)
Divert at least 75% of the total construction and demolition material; diverted materials must include at least four material streams.

OR

Option 2. Reduction of Total Waste Material (2 points)
Do not generate more than 2.5 pounds of construction waste per square foot (12.2 kilograms of waste per square meter) of the building's floor area.

General Pilot Documentation Requirements

Register for the pilot credit Credits 1-14 Credits 15-27 Credits 28-42 Credits 43-56 Credits 57-67 Credits 68-82 Credits 83--96
Credit specific

Required Documentation BD&C

Option 1

Option 2

List of construction waste generated and diverted to landfill itemizing the waste, the material stream, waste total amount, and diverted amount per item and total for project. All units of measure must be consistent

x

 

Evidence of average recycling rates for Commingled waste sorting Facilities (if applicable)

x

 

Explanation why Waste-to-Energy Must be Used (if applicable)

x

 

Proof of Certification for Waste-to-Energy Facilities (if applicable)

x

 

Waste per Area for entire project

 

x

Changes:
  • 4/1/2013: added documentation requirements
  • 6/19/2013: added CI to applicable rating systems
See all forum discussions about this credit »

What does it cost?

Cost estimates for this credit

On each BD+C v4 credit, LEEDuser offers the wisdom of a team of architects, engineers, cost estimators, and LEED experts with hundreds of LEED projects between then. They analyzed the sustainable design strategies associated with each LEED credit, but also to assign actual costs to those strategies.

Our tab contains overall cost guidance, notes on what “soft costs” to expect, and a strategy-by-strategy breakdown of what to consider and what it might cost, in percentage premiums, actual costs, or both.

This information is also available in a full PDF download in The Cost of LEED v4 report.

Learn more about The Cost of LEED v4 »

Documentation toolkit

The motherlode of cheat sheets

LEEDuser’s Documentation Toolkit is loaded with calculators to help assess credit compliance, tracking spreadsheets for materials, sample templates to help guide your narratives and LEED Online submissions, and examples of actual submissions from certified LEED projects for you to check your work against. To get your plaque, start with the right toolkit.

Get the inside scoop

Our editors have written a detailed analysis of nearly every LEED credit, and LEEDuser premium members get full access. We’ll tell you whether the credit is easy to accomplish or better left alone, and we provide insider tips on how to document it successfully.

USGBC logo

© Copyright U.S. Green Building Council, Inc. All rights reserved.

Intent

Pilot Credit Closed
This pilot credit is closed to new registrations
To reduce construction and demolition waste disposed of in landfills and incineration facilities by recovering, reusing, and recycling materials.

Requirements

* This credit language is drawn from the LEED v4 draft. Where other point totals are noted, this pilot credit is worth 1 point in total. *Recycle and/or salvage nonhazardous construction and demolition materials. Calculations can be by weight or volume but must be consistent throughout.

Exclude excavated soil, land-clearing debris from calculations. Include materials destined for alternative daily cover (ADC) in the calculations as waste (not diversion). Include wood waste converted to fuel (bio-fuel) in the calculations; other types of waste-to-energy are not considered diversion for this credit.

However, for projects that cannot meet credit requirements using reuse and recycling methods, waste-to-energy systems may be considered waste diversion if the European Commission Waste Framework Directive 2008/98/EC and Waste Incineration Directive 2000/76/EC are followed and Waste to Energy facilities meet applicable European Committee for Standardization (CEN) EN 303 standards.

Option 1. Diversion (1-2 points)
Path 1. Divert 50% and Three Material Streams (1 point)
Divert at least 50% of the total construction and demolition material; diverted materials must include at least three material streams.

OR

Path 2. Divert 75% and Four Material Streams (2 points)
Divert at least 75% of the total construction and demolition material; diverted materials must include at least four material streams.

OR

Option 2. Reduction of Total Waste Material (2 points)
Do not generate more than 2.5 pounds of construction waste per square foot (12.2 kilograms of waste per square meter) of the building's floor area.

General Pilot Documentation Requirements

Register for the pilot credit Credits 1-14 Credits 15-27 Credits 28-42 Credits 43-56 Credits 57-67 Credits 68-82 Credits 83--96
Credit specific

Required Documentation BD&C

Option 1

Option 2

List of construction waste generated and diverted to landfill itemizing the waste, the material stream, waste total amount, and diverted amount per item and total for project. All units of measure must be consistent

x

 

Evidence of average recycling rates for Commingled waste sorting Facilities (if applicable)

x

 

Explanation why Waste-to-Energy Must be Used (if applicable)

x

 

Proof of Certification for Waste-to-Energy Facilities (if applicable)

x

 

Waste per Area for entire project

 

x

Changes:
  • 4/1/2013: added documentation requirements
  • 6/19/2013: added CI to applicable rating systems
See all LEEDuser forum discussions about this credit » Subscribe to new discussions about Pilot-Credits MRpc69