Topic | Recent |
---|---|
Laboratory SinksCI-v4 WEc1: Indoor water use reductionposted by Edgar Arevalo on May 9, 2024, 1:44 pm
I have a laboratory project where they will include sinks in the bio lab spaces. How do we include this in the indoor water use calculator, would it be more like a kitchen faucet or public... Last reply: Edgar Arevalo, May 11, 2024, 8:53 am |
|
Operational Carbon Projection and Decarbonization Plan + ElecrificationLEED v5 BD+C/ID+C: Energy and Atmosphere Public Commentsposted by Emily Purcell on Apr 26, 2024, 2:53 pm
How do projects on combustion-fueled district energy systems approach this prereq & credit? Many campus projects with a central plant are now being designed to use no fossil fuel on... Last reply: Emily Purcell, May 10, 2024, 1:11 pm |
|
Are all spaces outside the 3x head height excluded?NC-v4.1 EQc8: Quality Viewsposted by Jeff Ross-Bain, PE, LEED Fellow, WELL AP on May 10, 2024, 9:17 am
I realize this is most likely quite a basic question, but in V4.1 are allowable quality view areas only for those regularly occupied spaces within the 3x head height zone and all others do not... Last reply: Emily Purcell, May 10, 2024, 12:27 pm |
|
IDc1.3: Safety First: Cleaning and Disinfecting Your SpaceWorking through COVID-19posted by Carlos Sanchez on Dec 11, 2020, 1:53 am
I am struggling with finding the green cleaning criteria for this credit. Any help would be greatly appreciated. Last reply: Michelle Cordero, May 10, 2024, 10:48 am |
|
LEED v5 for existing buildingsLEED v5 O&M Existing Buildings Public Commentsposted by Steve Krines on May 10, 2024, 7:42 am
After reading this it appears that cleaning, cleaners and training are being undervalued. This should be remedied. |
|
Simulating Daylighting ControlsCS-v4 EAp2: Minimum Energy Performanceposted by Paula Hernandez on Apr 29, 2024, 7:39 am
Hello, We have to simulate “daylighting controls” for a space with skylights and side-lighting. I am using HAP 5.11 to make the energy simulation, which will need an exceptional... Last reply: Paula Hernandez, May 10, 2024, 7:05 am |
|
Completed fit out by owner for rentable office building- not known future tenantsLEED Rating System Selectionposted by ANGELIKI ANTONIOU on Jul 4, 2023, 9:29 am
Hello everyone! We have a 3 storey office buidling which is designed to be rented per floor. The tenants have not yet been determined. The architectural layout is fix (location and... Last reply: Andrey Kuznetsov, May 10, 2024, 5:40 am |
|
Senior cohousingLEED Rating System Selectionposted by Gianfranco Ibarcena on Jun 2, 2023, 1:04 pm
I am developing a senior cohousing project. It has 34 permanent homes in a maximum of 3 stories buildings. It also has common areas like restaurant, gym or laundy room only for internal use and ... Last reply: Andrey Kuznetsov, May 10, 2024, 5:18 am |
|
First public comment draft of LEED v5 BD+C/ID+C: Integrative ProcessLEED v5 BD+C/ID+C: Integrative Process, Planning, And Assessments Public Commentsposted by Nadav Malin on Apr 2, 2024, 2:08 pmShare your comments on the first public comment draft of the LEED v5 BD+C/ID+C: Integrative Process, Planning, And Assessments section on this forum. You can either reply to this thread or use the... Last reply: Mark Terpstra, May 9, 2024, 6:31 pm |
|
LEED v5 BD+C/ID+C: Indoor Environmental Quality public commentsLEED v5 BD+C/ID+C: Indoor Environmental Quality Public Commentsposted by Nadav Malin on Apr 2, 2024, 5:06 pm
Share your comments on the first public comment draft of the LEED v5 BD+C/ID+C: Indoor Environmental Quality section on this forum. You can either reply to this thread or use the "Post a Question... Last reply: Mark Terpstra, May 9, 2024, 6:26 pm |