Log in
Forum
Topic

Laboratory Sinks

CI-v4 WEc1: Indoor water use reduction
posted by Edgar Arevalo on May 9, 2024, 1:44 pm

I have a laboratory project where they will include sinks in the bio lab spaces.  How do we include this in the indoor water use calculator, would it be more like a kitchen faucet or public...

Last reply: Emily Purcell, May 10, 2024, 2:21 pm

Operational Carbon Projection and Decarbonization Plan + Elecrification

LEED v5 BD+C/ID+C: Energy and Atmosphere Public Comments
posted by Emily Purcell on Apr 26, 2024, 2:53 pm

How do projects on combustion-fueled district energy systems approach this prereq & credit? 

Many campus projects with a central plant are now being designed to use no fossil fuel on...

Last reply: Emily Purcell, May 10, 2024, 1:11 pm

Are all spaces outside the 3x head height excluded?

NC-v4.1 EQc8: Quality Views
posted by Jeff Ross-Bain, PE, LEED Fellow, WELL AP on May 10, 2024, 9:17 am

I realize this is most likely quite a basic question, but in V4.1 are allowable quality view areas only for those regularly occupied spaces within the 3x head height zone and all others do not...

Last reply: Emily Purcell, May 10, 2024, 12:27 pm

IDc1.3: Safety First: Cleaning and Disinfecting Your Space

Working through COVID-19
posted by Carlos Sanchez on Dec 11, 2020, 1:53 am

I am struggling with finding the green cleaning criteria for this credit. Any help would be greatly appreciated.

Last reply: Michelle Cordero, May 10, 2024, 10:48 am

LEED v5 for existing buildings

LEED v5 O&M Existing Buildings Public Comments
posted by Steve Krines on May 10, 2024, 7:42 am

After reading this it appears that cleaning, cleaners and training are being undervalued.  This should be remedied.

Simulating Daylighting Controls

CS-v4 EAp2: Minimum Energy Performance
posted by Paula Hernandez on Apr 29, 2024, 7:39 am

Hello,

We have to simulate “daylighting controls” for a space with skylights and side-lighting.

I am using HAP 5.11 to make the energy simulation, which will need an exceptional...

Last reply: Paula Hernandez, May 10, 2024, 7:05 am

Completed fit out by owner for rentable office building- not known future tenants

LEED Rating System Selection
posted by ANGELIKI ANTONIOU on Jul 4, 2023, 9:29 am

Hello everyone!

We have a 3 storey office buidling which is designed to be rented per floor.

The tenants have not yet been determined. The architectural layout is fix (location and...

Last reply: Andrey Kuznetsov, May 10, 2024, 5:40 am

Senior cohousing

LEED Rating System Selection
posted by Gianfranco Ibarcena on Jun 2, 2023, 1:04 pm

I am developing a senior cohousing project. It has 34 permanent homes in a maximum of 3 stories buildings. It also has common areas like restaurant, gym or laundy room only for internal use and ...

Last reply: Andrey Kuznetsov, May 10, 2024, 5:18 am

First public comment draft of LEED v5 BD+C/ID+C: Integrative Process

LEED v5 BD+C/ID+C: Integrative Process, Planning, And Assessments Public Comments
posted by Nadav Malin on Apr 2, 2024, 2:08 pm

Share your comments on the first public comment draft of the LEED v5 BD+C/ID+C: Integrative Process, Planning, And Assessments section on this forum. You can either reply to this thread or use the...

Last reply: Mark Terpstra, May 9, 2024, 6:31 pm

LEED v5 BD+C/ID+C: Indoor Environmental Quality public comments

LEED v5 BD+C/ID+C: Indoor Environmental Quality Public Comments
posted by Nadav Malin on Apr 2, 2024, 5:06 pm

Share your comments on the first public comment draft of the LEED v5 BD+C/ID+C: Indoor Environmental Quality section on this forum. You can either reply to this thread or use the "Post a Question...

Last reply: Mark Terpstra, May 9, 2024, 6:26 pm