Topic | Recent |
---|---|
VOC limit of Aerosol AdhesivesNC-v4 EQc2: Low-emitting materialsposted by Laurie Winter on Feb 11, 2020, 8:21 pmDebra a. Lombard Construction Administrator/ LEED AP Bywater Woodworks, Inc. LEEDuser Basic Member 46 thumbs up February 12, 2020- 12:05 pm This info link is relevant to aerosol adhesive reporting for v4.1 Schools: https://leeduser.buildinggreen.com/forum/ieq41-aerosol-adhesives-conversion Log in or register to post comments Laurie Winter LEEDuser Premium Member February 12, 2020- 3:44 pm Debra, Yes, I did see that link before posting but I'm not sure whether it's relevant to LEED v4 or V4.1. It's posted in the 2009 forum for IEQc4.1and I haven't come across any verified... Last reply: Suzanne Roach, May 9, 2024, 5:11 pm |
|
MRc Low Emitting MaterialsLEED v5 BD+C/ID+C: Materials and Resources Public Commentsposted by Emily Purcell on Apr 12, 2024, 1:41 pmof these might be more review approach issues than credit language issues. but the forums here are full of project teams doing 95% of this credit right and having to expend a lot of time working with manufacturers... Last reply: Emily Purcell, May 9, 2024, 3:27 pm |
|
Certifiying a Historic Building & New ConstructionLEED Rating System Selectionposted by Dominique Dowd on Feb 8, 2024, 5:22 pm
I'm working a v4 BD+C Multifamily project.... Last reply: Susan Di Giulio, May 9, 2024, 1:50 pm |
|
Laboratory SinksCI-v4 WEc1: Indoor water use reductionposted by Edgar Arevalo on May 9, 2024, 1:44 pm
I have a laboratory project where they will include sinks in the bio lab spaces. How do we include this in the indoor water use calculator, would it be more like a kitchen faucet or public... |
|
Option 2- Carshare, requirementsNC-v4.1 LTc7: Reduced parking footprintposted by Ricardo Sá on Feb 11, 2020, 11:47 am
Dear All, I have a question regarding Option 2 – Carshare. Which are the requirements of a parking place in order to be classified as a carshared... Last reply: Talia Mamayek, May 9, 2024, 9:50 am |
|
INpc155- Design for Indoor Air Quality and Infection ControlCS-v4 INc1: Innovationposted by Sustainability & Commissioning on Apr 25, 2023, 2:10 pm
Hi all, The Pilot Credit: Design for... Last reply: Sustainability & Commissioning, May 9, 2024, 8:59 am |
|
Ventilation requirements/ auto garage / pre-requisiteNC-v4 EQp1: Minimum indoor air quality performanceposted by Carla Galvanoni on May 8, 2024, 1:57 pm
We are attempting to use special circumstances to satisfy the minimum air quality performance, as our project does not fall under a category. We have a repair garage where work on vehicles... |
|
GHG emissions calculations for LEED v4- 2024 UpdateNC-v4 EAc2: Optimize Energy Performanceposted by Jacob Stieb on May 8, 2024, 6:20 pm
The 2024 update to LEED v4 splits the points into energy cost (site/source) and... |
|
Inherently NonemittingNC-v4.1 EQc2: Low-emitting materialsposted by Allen Cornett on Apr 3, 2023, 1:19 pm2024- 5:56 pm I don't know of any 'joint tapes' that would be considered inherently nonemitting. Here is a forum discussion that may help: Joint Compound and Joint Tape- GREENGUARD Gold... Last reply: Ralph Bicknese, May 8, 2024, 6:08 pm |
|
Can ID+C be selected for whole building?LEED Rating System Selectionposted by Leo LeQuoc on Jan 29, 2024, 11:20 pm
Our team is working on a project of a whole 2-storey (to be) newly constructed office building. I wonder (1) whether we can apply both floors to ID+C rating system or it has to be a single... Last reply: Andrey Kuznetsov, May 8, 2024, 5:08 pm |