Forum topic
Hi - We have some projects within reasonable reach of ILFI's Zero Carbon Certification, which will require purchasing some off-site renewable energy. As a State Building Code Council member, I'm also eyeing the Zero Code which we will seriously consider in the next 12 months; this also requires a purchase of off-site renewable energy.
I... Read more
Forum topic
I'm exploring the use of phase change material for a project. Specifically, looking at the BioPCM/ENRG Blanket product. I see on their website that ZGF used it at University of Washington. I'd love to hear any feedback from folks who have used it, and more specifically how your energy model and MEP engineer accounted for it. Thanks!! https://... Read more
Forum topic
Hi all,
We are trying to encourage participation in take-back programs and using recyclable packaging with our vendors and I was wondering how we can add it to specifications. Does anyone have any examples on how we can add wording in specs about participation in take-back programs, using recyclable packaging and/or reducing non-... Read more
Forum topic
Hi,
There is a Blog section on the BIT User site. Will you have a blog post in time for launch? Or should we hide that section to begin with?
https://live-bituser.pantheonsite.io/blog
Andrea
Forum topic
In an effort to share expert knowledge on the topic of whole building LCA, we are continuing our expert guest webinar series, addressing the topic of steel on March 19th at 1PM EDT. Michael Gryniuk PE, with LeMessurier and SE 2050, will be joining us to share his strategies for reducing the embodied carbon of steel. This webinar is particularly... Read more
Forum topic
HI MEP Leaders,
Related to our thread about equipment needed for decarbonization, I have a question about what new or improved equipment is already available now that you're excited about.
Every year we at BuildingGreen publish (and present at Greenbuild) a listing of the Top-10 new and exciting products. Our focus this year is on... Read more
Forum topic
Anyone else having this experience? We've got a LEED 2009 Core/Shell project that we've now been contracted to do a fitout within for one of the first tenants. If anyone else has had this experience and is willing to talk with me about how your process for it has gone, I'd be fantastically grateful.
Find me directly at awilson@asg-... Read more
Forum topic
Hi all,
We're doing some tool-related soul searching at WRNS and some folks here have raised Cove.Tool as a potentially interesting addition to our library. I'm looking for any insight you all can provide. Cove has come up various times, but curious if there's been any change for the better/worse in the past few years.
Do you use... Read more
Product Guide
Lighting can be inefficient and have poor quality, short lifespans, and toxic ingredients.
BuildingGreen-Approved Replacement Lamps and Lighting
BuildingGreen approves a variety of replacement lamps and lighting, including:
Energy Star-qualified LED replacement lamps (or light bulbs), including A19 Edison, screw-in products... Read moreQuiz
Welcome to the quiz portion of Pest Prevention: Steps Designers Can Take!
Learning Objectives
Upon completing this course, participants will be able to:
Reports, Courses, Study Guides, Live Webinars
A site license allows your entire organization to access and share the report, and to keep a copy in your library. The site license does not allow multiple users to earn CEUs. If multiple individuals in your organization would like to earn CEUs from this report, please purchase individual copies.
The world’s most... Read more
Forum topic
Hello SMEPers,
I’m hoping to crowd source some anecdotes for a guest lecture I’ll be giving at Yale’s architecture school. The topic is integrated design (especially between architects and engineers) and how it enables better sustainability outcomes.
John Boecker has this great story about how choosing a paint color with higher... Read more
Quiz
Welcome to the quiz portion of Building Re-Entry with Arc
Learning Objectives
Upon completing this course, participants will be able to:
1. Explain the similarities and differences between LEED v4.1 O+M performance metrics and the Arc Re-Entry program.
2. Understand how Arc Re-Entry contributes to an iterative re-... Read more
Forum topic
We have a project that is looking for plaster/stucco/textured wall products that are sustainable, or “more sustainable.”
I know these products exist, but I haven’t had to spec or work with any, so I’m reaching out.
The project is in MA, so I'm also soliciting recommendations for products and/or companies who are experienced using... Read more
Peer Network Event
Forum topic
I am still basking in the afterglow of this week's summit, and getting ready to share nuggets of wisdom with my colleagues at our all-staff next week. I was so immersed in the moment that documenting the outlines and choices presented for breakouts slipped my mind. Is there somewhere to access these slides to refresh my memory?
Thanks... Read more
Forum topic
I know we have talked about this on various calls, so I wanted to post in case anyone hasn't seen that the IRS has provided an update with rules on how to access the direct pay option.
https://www.usgbc.org/articles/irs-issues-ira-tax-credit-rules-tax-exemp...
Forum topic
Hello Sustainable Design Leaders!
Here at BuildingGreen we are excited and looking forward to creating a valuable and engaging online summit with you all for 2020!
You can Register HERE as well as review important information.
The Summit will happen throughout the week of July 13. The specific meeting times are:
3:... Read more