Forum topic
Team,
Many of you saw this from BlackRock.
https://www.blackrock.com/corporate/investor-relations/larry-fink-ceo-letter
SOM, starting with London office, is drafting a letter to our MEP consultants, demanding and holding them accountable for climate change as a preference on consultants selection.
Best,
LL
Forum topic
Has anyone worked on a project installing a PowerNest system? I just found out about it today and would love to get working information on it.
Here's the link, in case its new to you as well. https://www.ibispower.eu/home
Thank you -
Forum topic
I was wondering if any of you have experience with integrated PVs and/or solar glass. If so, can you could recommend manufactures for each? We are working on a multistory freestanding building in an urban site for a mid-Atlantic city. Because our site and roof area are limited we are looking to maximized the areas where we can generate power.... Read more
Product Guide
Rotary Uninterruptible Power Units
Power interruptions and brief changes in voltage can damage electrical equipment, compromise computer data, shut down manufacturing, and endanger hospital patients. In the case of power outages, generators usually take over, but about 98% of all interruptions last less than ten seconds, and there is a... Read more
Quiz
Welcome to the quiz portion of Equity in Design and Construction: Seven Case Studies!
Learning Objectives
Upon completing this course, participants will be able to:
Forum topic
Hi everyone, on our SDL Regional Leaders call today we touched on how different offices are engaging with the Youth Climate Strike on Sept 20, and I offered to share a few resources that we've developed:
1) Here is our public-facing official statement/endorsement: https://www.vmdo.com/architecture-blog/vmdo-youth-climate-strike/?fbclid... Read more
Forum topic
Hey all - sorry I won't be able to join our call today. I had a client request an emergency meeting today (boo) because corporate mandated that they eliminate fossil fuel use from all their buildings (yay!) by 2025 and they've got a project underway that needs to pivot quickly.
Had I been able to join, I wanted to share this in case... Read more
Forum topic
Hi all,
We have a newly constructed, core/shell project having some hot water issues in the core restrooms.
There is a 0.35 Toto lav installed throughout. The hot water heaters are adjacent on each floor, located in the janitor closets. We did the math, and there could be a gallon of water standing and cooling in the pipe between... Read more
Forum topic
Mithun has a part-time employee Jake Minden who is a graduate student at the University of Washington. Jake is participating in a year-long research fellowship focused on equitable design practice. He has developed a survey to collect perceptions of workplace culture.
Please consider taking 10-minutes to help gather this valuable... Read more
Forum topic
AIA is looking for additional technical review jurors for their 2022 COTE Top Ten Award program particularly in the Water/Ecosystems and Energy/Discovery categories. If you are interested please go to this webpage and complete the form.
Time is of the essence, so please complete the form no later than Friday, January 14, 2022.
Forum topic
Hello friends,
Recently, as part of the AIA 2030 working group discussion – a topic came to light that was a conversation among (I believe) the SDL subset of our community, on a topic that is my personal obsession and daily focus – so I wanted to pipe up and share thoughts. BUT I want to respect the safe space, so if those of you in SDL... Read more
Forum topic
Hey there SDLs!
We're having a debate in our firm about whether we're at a tipping point to hire an in-house energy modeler - someone capable of doing an MEP-caliber energy model inside a design firm. I know some you have in-house energy modelers on staff and I'd love to hear your experiences:
- How did you know your firm was at a... Read more
Forum topic
I don't have any direct affiliation with this role other than a former colleague asked if I would share the job posting for Director of Sustainability at Corgan with my network - that's you! She provided a little more context - they are obviously looking for someone with sustainability experience but are open to an up-and-comer who would be... Read more
Quiz
Welcome to the quiz portion of The Four Core Issues to Tackle for Resilient Design (And the Programs That Can Help).
Learning Objectives
Upon completing this course, participants will be able to:
1. Use site-specific hazard analysis to evaluate a project’s resiliency demands.
2. Use climate change data to... Read more
Forum topic
Hi MEP Leaders!
Here's a reminder that our monthly meeting is coming right up--today at 2:00 pm ET.
There is a lot to talk about: James has put together a starting point for our "how to make the best use of your engineer" guide. And Summit plans...
You can view the agenda here.
All members of the SMEPL network are... Read more
Forum topic
Greenbuild bound colleagues-
I unfortunately cannot join for the summit Tuesday but should be flying in early enough to potentially join the group for dinner. Are there any plans brewing that I might join?!
Let me know? Thanks.
Katie Rothenberg
Vice President, Sustainability & Innovatio
HITT Contracting... Read more
Forum topic
Hey all,
I got plugged into this group about two weeks before GreenBuild and wasn't able to make it to the summit. I'm still catching up on all the work this group has been doing recently, but I know one of the big ticket items is the SCL Contractor Commitment.
I've read through the commitment that was posted right before... Read more
Forum topic
You can download the guide here:
https://www.collaborativedesign.org/
And I would ask that any/all of you who find this interesting and useful to please share with your networks. We want it to get distributed far and wide!
- Clark