Forum topic
HI All,
I am curious if others are using THERM in-house for your envelope design?
We usually use our building envelope/curtain wall consultants (Boston - so mostly RWDI and Heintjes) but our teams are finding that they need the information faster than our consultants can provide, they are backlogged, or we have some curtain wall... Read more
Forum topic
For those that missed Z's subtle mention of this a few weeks ago, Bora finally decided sustainability is important enough to have someone dedicated full-time to it, and then went out and got one of the best:
https://bora.co/bora-hires-sustainability-director-corey-squire/?tax=all-posts
I've been sharing Corey's thoughts on... Read more
Forum topic
This is sort of dragging up an ancient topic, but curious how your firms are currently addressing accreditation (LEED AP, WELL AP, LFA, etc.). There was a time when we were all talking about this, and a number of firms instituted requirements, but it has been a long time, and I'm curious how it's looking now in 2024. Thanks!
Forum topic
Both Z Smith and Lois Vitt Sale have been notified that they have been elected to the College of Fellows of the AIA, class of 2018.
Please join me in congratulating Z and Lois, and post here if you know of others who can now carry the FAIA label.
Well done guys!
Forum topic
I am now embarking on the home page design, but before I get started I need input on what you'd like to have there. The style tiles/tidbits provided by Southface includes a home page mockup that's very similar to LEEDuser, which is fine with me, but I don't want to implement it and then find out you want something radically different.
I... Read more
Forum topic
Mark your calendars Sustainable MEP Leaders!!
Here are the details to save the date for the 2020 MEP Summit:
Date: June 9th and 10th, 2020
Location: Stantec Office in Denver, CO
Schedule Outline: Tues. 9th beginning with Lunch at Noon, ending Wed. about 3pm
Gather and learn from your peers! Share your challenges... Read more
Forum topic
All--
I haven't been part of this group in a while, but I'm excited to have rejoined recently. Some of you know that I joined HMC last year as Chief Impact Officer. I oversee design, sustainability, research, and communications for the firm, which has 300 people in 6 offices in California. We were founded in 1940 with a mission to serve... Read more
Quiz
Welcome to the quiz portion of The Death and Rebirth of DC Power.
Learning Objectives
Upon completing this course, participants will be able to:
Explain when and how to integrate DC power into buildings, and the benefits of doing so.
Understand the history and background of AC and DC power in the U.S.
... Read more
Forum topic
Mass Timber Construction: An Economic Study of Supply, Best Use, and Implementation in three North American regions
This series unveils a macroeconomic study of building with mass timber in three U.S. regions; the Upper Midwest, Rocky Mountain Colorado, and the Southeast.
Three companies - SCB Architects, LeMessurier, and Turner... Read more
Forum topic
Join your peers and BuildingGreen February 22–26, 2021 for an all you can eat buffet week of networking, problem solving, and connecting with sustainability leaders within your industry and across the Peer Networks! During this week we will create a space for you to offer and receive support, exchange ideas and resources, and become stronger,... Read more
Forum topic
Folks,
In case any of you enjoy the Phoenix weather, I wanted you to be sure to know that our company, Sundt, which is headquartered here is looking for a sustainability director to lead up our efforts. This comes after two years of work and hiring a consultant (Brightworks out of California) to help us prepare and take the next steps. I... Read more
Forum topic
Does anyone know about temporary flushout equipment that could be used to augment a building's systems to get additional CFM of OA during construction? For our non-laboratory type projects the flushout period ends up being too long, especially in either humid summers or frigid winters (Pennsylvania).
Hoping that some of you on either... Read more
Product Guide
Lighting can be inefficient and have poor quality, short lifespans, and toxic ingredients.
BuildingGreen-Approved Replacement Lamps and Lighting
BuildingGreen approves a variety of replacement lamps and lighting, including:
Energy Star-qualified LED replacement lamps (or light bulbs), including A19 Edison, screw-in products... Read moreForum topic
All, today is the day I had committed to sending out the DRAFT request to equipment manufacturers of what is needed for full electrification. I apologize that I didn't have time or focus to get my thoughts together till now (I had intended to share this with Chris and others prior to sending to the full group, but just didn't get my thoughts... Read more
Quiz
Welcome to the quiz portion of Building Re-Entry with Arc
Learning Objectives
Upon completing this course, participants will be able to:
1. Explain the similarities and differences between LEED v4.1 O+M performance metrics and the Arc Re-Entry program.
2. Understand how Arc Re-Entry contributes to an iterative re-... Read more