BuildingGreen Report

Forum topic

Hi,

HKS is seeking two seasoned sustainability leaders to be part of the DesignGreen Team embedded into either our Mission Critical and Commercial Mixed Use practice. In general, the role is to service clients and drive sustainable design quality forward. We have a great team and need even more wise, energetic, creative, and committed... Read more

Forum topic

Greetings from the CARE Tool Team,

We are thrilled to update you on the successful soft launch of the CARE Tool last week at Greenbuild! The online beta was unveiled at a reception hosted by EHDD, AIA COTE, and Architecture 2030 to 300+ people, where attendees got the chance to learn about and explore the tool in a demo room. We... Read more

Campus-wide Group

Forum topic

We're now mid-way through Summer Summit season! One of the “good problem to have” challenges we’ve had at recent SDL Summits has been too many great five-minute presentations. It’s hard to find time for them all. This year, since we’ll be online anyway, we can get a jump on that by starting the five-minute presentations early in addition to... Read more

Campus-wide Group

Forum topic

Hi all, 

I just wanted to post a quick message to introduce myself to the group. My name is Jeff Geisinger, and I'm an architect with Utile in Boston. We're a 50-ish person firm with a pretty broad project base, including affordable multifamily housing, institutional buildings, commercial interiors, and urban planning/public realm work... Read more

Forum topic

Does anyone have a spreadsheet or chart that compares the new Fitwel v2.1 with Fitwel v2.0 ?

I can't seem to find such a thing on the Fitwel website.

I am trying to determine which version-route to take on our "Workplace" project.

Or do you have experience in this that you can relay?

Thanks.

Peer Network Event

Product Guide

There are a number of clear finish options available, from natural oils and low-toxicity products primarily used on residential woodwork through factory-applied finishes where specific aesthetics and/or added durability are required (such as those used on cabinetry or commercial architectural millwork). Many of these have very high VOC levels,... Read more

Sales page

Special offer: Download these 2 reports FREE when you purchase a new BuildingGreen Premium annual membership ($199/year, save 17% over monthly, cancel anytime) BuildingGreen’s Guide to BUILDING ENVELOPE PRODUCTS Use our simple, clear criteria for selecting... Read more

Forum topic

We had these conversations grouped by size of firm. 

Guiding Questions:

Knowledge Management By Firm Size

How to give people the info they need, when they need it?

Is the COTE Top Ten a good framework?

This seems extremely daunting in a large firm. How do we manage content that is produced and shared... Read more

Forum topic

Friends of EPIC –

Hey, everyone. As some of you might have heard, we’ve been working for a while with Autodesk to get c.scale (the data model behind EPIC) built into Forma – Autodesk’s AI-powered planning tool. Forma is packaged within Autodesk’s AEC collection and most firms using Revit should already have access. This integration is... Read more

Quiz

Welcome to the quiz portion of The PVC Debate: A Fresh Look

Learning Objectives
Upon completing this course, participants will be able to:


 

1. Catalog the history of PVC in the building industry.
2. Recount the connections between PVC and chlorine, dioxins, mercury, and vinyl chloride.
3. Explain the... Read more

Forum topic

Hi All,

The SMEPL's Embodied Carbon committee has been hard at work developing a letter that calls for MEP equipment vendors to increase material transparency in their products.  As a way of contacting the most widely-used vendors first, we're asking each of you to enter your "Top 3" specified vendors for each of the products listed in... Read more

Forum topic

Hello Folks,
What is your experience with successes and failures in the design process? As a starting point I have listed my Top 5 for success, and my Top 5 for failure. We'd love to see your reactions and look forward to the discussion when we all meet next week at our monthly check-in.

Top 5 reasons for when integrative design... Read more

Forum topic

Hi all,

We have a newly constructed, core/shell project having some hot water issues in the core restrooms.

There is a 0.35 Toto lav installed throughout. The hot water heaters are adjacent on each floor, located in the janitor closets. We did the math, and there could be a gallon of water standing and cooling in the pipe between... Read more