BuildingGreen Report

E-Product Display

Forum topic

All, today is the day I had committed to sending out the DRAFT request to equipment manufacturers of what is needed for full electrification.  I apologize that I didn't have time or focus to get my thoughts together till now (I had intended to share this with Chris and others prior to sending to the full group, but just didn't get my thoughts... Read more

Forum topic

Hello, Sustainability Leaders! 

I’m excited to be sharing a virtual hello to this network more formally (waving, big yellow energy, sparkle emoji - all of the above). If we’ve yet to meet, I’m so looking forward to chatting down the road. I’m Jill Maltby-Abbott, BuildingGreen’s newest team member. I'm working most closely with Brent,... Read more

Author

Campus-wide Group

Forum topic

I'm teaching a LEED GA study group and was rambling on the differences between CIR and precident-setting LEED Interpretation (that gets posted in the addenda library and all). Then I went onto LEED Online and was showing how those are submitted... but can't actually figure out how a LEED Interpretation would be submitted. Has anyone done this... Read more

Forum topic

Sign up now to roll up your sleeves and have fun solving real problems! April 28 from 3-5pm ET

DESIGNING FOR DECONSTRUCTION

Building deconstruction, or disassembly, is a critical strategy for carbon reduction, minimizing waste & contributing to a circular economy, yet remains a serious challenge for many reasons.

Many... Read more

Forum topic

Hi - we're working with the University of California Office of the President to put together low-carbon case studies. The two types we are looking for now include 1) a low-carbon TI (not a full building gut/renovation), and 2) any that involve the circular economy (in this case not just building reuse but product reuse) which could include... Read more

Forum topic

Beginning this year, Miller Hull will not only continue to quantify the upfront embodied carbon of every project we finish through construction, but now purchase third-party certified carbon offsets equivalent to one-third of the project’s impact. Great design is no longer enough - we must take responsibility for our architectural impact in the... Read more

Forum topic

Currently, the BIT User site is fully accessible without having to log in (unless you want to edit or add content, of course). The time has come, however, to start restricting access only to logged-in users.

Which sections will be freely visible, and which will be visible only to registered users? Here's what I recall from our earlier... Read more

Forum topic

The 2018 ENR Green Building Survey is due March 16th.  I'm sure you all know the metric they use to evaluate your ranking is solely the revenue from projects pursuing a green building certification in the previous calendar year.  Personally, I think this totally bogus.  How "green" a contractor is may correlate with how much revenue they have... Read more

Forum topic

Hello everyone,

Here's a reminder that our call for this month will be taking place next Tuesday, November 12th at 2:00pm EST.

Please feel free to join us!

Join Zoom Meeting:

https://zoom.us/j/248664490

One tap mobile
+16699006833,,248664490# US (San Jose)
+19292056099,,248664490# US (New York)... Read more

Forum topic

Does anyone know about temporary flushout equipment that could be used to augment a building's systems to get additional CFM of OA during construction?  For our non-laboratory type projects the flushout period ends up being too long, especially in either humid summers or frigid winters (Pennsylvania).

Hoping that some of you on either... Read more

Forum topic

Hello everyone. I am seeking some guidance on crafting an arguement for why my firm should support a change to the Washington State Energy Code which would mandate electric heat pumps for commercial builidngs.  AIA WA is working on the state commercial energy code update under consideration this spring.  We have been invited to sign on to an... Read more

Product Guide

Metal windows are used in commercial building because of their durability, low maintenance, and ability to handle wind loads.

BuildingGreen-Approved Windows

Metal windows must achieve an NFRC-certified unit U-factor of 0.20 or lower to be approved by BuildingGreen.

Manufacturers also must demonstrate that their highest-... Read more

Quiz

Welcome to the quiz portion of Protect Your Spec: 14 Strategies. 

Learning Objectives
Upon completing this course, participants will be able to:


Identify ways to ensure continuity between the environmentally preferable materials in a project specification, and the less-than-ideal materials that end up used in the final... Read more

Working Group