Forum topic
Hi all,
Thank you again to those of you who attended the Spring 2024 SCL Summit! We had an amazing day of learning from one another, including from our presenters.
The slides for the 5-minute presentations are below, as well as the BuildingGreen slides from the Summit. Please be aware that we have permission from all of the... Read more
Forum topic
Hi, the SF Dept of Environment is doing some surplus construction materials studies there are surveys for designers and contractors. They are looking for a wide array of responses, so don't worry if you don't live in that area!
See link for contractor survey if you are interested:
https://formfacade.com/public/... Read more
Forum topic
Hello All,
Checking in on experience with Armstrong's Tectum E-N with NEOPOR Graphite polysytrene GPS rigid foam insulation core in roof panels for exposed structure?
BASF says that NEOPOR uses up to 30% less material than other rigid foam; it is greenguard gold cerified.
Interesting that the NEOPOR increases in R-value as... Read more
Forum topic
Now that Ben has set up access restrictions, we have to decide what message to put on "paywall" screens. For example, on the Best Practices pages, the "Official language" tab is fully accessible, but if an anonymous user clicks on any of the other tabs they'll hit a login wall:
https://live-bituser.pantheonsite.io/best-practice/energy-... Read more
Forum topic
Hi everyone,
The winning date for our Waste Management call is 3/24/2020 from 12pm-1pm PST.
Here is a link to the Google hangouts meet as well as a call in number for those without gmail accounts:
meet.google.com/cae-gdxd-qpp
(US)+1 240-224-0800
PIN: 996 308#
I am working on putting together an... Read more
Forum topic
Since starting at LPA last fall, the number one question I get from people outside the firm is how we are hitting (2018-2019) or getting so close to hitting the 2030 Commitment goals.
Here is a chance to see for yourself! LPA is seeking a Sustainable Design Specialist to join our RED team (Research Education Design) - location open to... Read more
Quiz
Welcome to the quiz portion of Pest Prevention: Steps Designers Can Take!
Learning Objectives
Upon completing this course, participants will be able to:
Forum topic
Hi all - we have several projects where money from the IRA may be able to get projects farther. I've seen the AIA/USGBC webinar and done some other research as well. Does anyone know if there's a Higher Ed group that is chasing down how and when the money is available and for what exact purposes? Are you planning on using consultants to help... Read more
Forum topic
I posted this on the SCL as well, but am looking for anyone's experience and/or suggestions.
For any of you who are already tracking your Scope 1, 2 & 3 emissions: Do you do so through a program (like the Carbon Disclosure Project) or do you have an in house excel file or ???? I'm looking for a good template and am open to... Read more
Forum topic
Hi Gurus,
We are having a hard time sourcing a baby changing table that is free of anticmicrobial coatings. KoalaKare, the predominate manufacturer, includes Microban in both their plastic and stainless steel product options. Does anyone have any experience with a durable, ADA compliant and readily available baby changing table free of... Read more
Forum topic
We're wrapping up a multi year project that went through multiple design changes, leaving us with a ton of material samples. Does anyone know of a good place we could donate these samples to, to keep them out of the landfill. I'm in the greater Seattle area. Thank you for any suggestions.
Forum topic
We are working on a Core & Shell project with a developer that we work with frequently. I'm looking for advice on best approaches to achieving the Whole Building Life Cycle Assessment credit- we haven't used TALLY and done this type of analysis before. What are some approaches to achieving this credit that others have found successful? I... Read more
Forum topic
Hi Friends,
I'm working on an SOP for construction waste management for LBC core and LBC materials petal projects and wanted to get your input on the comingled facility requirements. According to the guidelines, any waste that goes to a comingled facility must be a facility that has an average diversion rate of 80% or higher as a... Read more
Forum topic
Sign up now to roll up your sleeves and have fun solving real problems! April 28 from 3-5pm ET
DESIGNING FOR DECONSTRUCTION
Building deconstruction, or disassembly, is a critical strategy for carbon reduction, minimizing waste & contributing to a circular economy, yet remains a serious challenge for many reasons.
Many... Read more
Basic page