BuildingGreen Report

Forum topic

Hi All,

The SMEPL's Embodied Carbon committee has been hard at work developing a letter that calls for MEP equipment vendors to increase material transparency in their products.  As a way of contacting the most widely-used vendors first, we're asking each of you to enter your "Top 3" specified vendors for each of the products listed in... Read more

Forum topic

Hello- If you use Procore....

Are your jobs using a template to conduct and create "reports" of their IAQ inspections? Did you set it up in forms or inspections? Would you mind sharing an example template with me? I know Green Badger has a great app to do this, which we use. We would use inspections in Procore for jobs that are not using... Read more

Campus-wide Group

Portal

TRENDING IN STANTEC’S REGIONS

Based on current projects, pursuits, and ongoing thought leadership, the following are hot topics across the Stantec Buildings group.

Read on to stay up to date with evolving skills and expertise not only in your own BC but also... Read more

Reports, Courses, Study Guides, Live Webinars

THIS WEBINAR PURCHASE AND REGISTRATION IS CLOSED.

  Thursday, April 4 at 2:00pm Eastern (11:00am Pacific), and featuring:

Katrina Amaral
Timberdoodle Farm

Jacob Dunn
ZGF

Steve Rigdon
Yakama Forest Products

Jennifer Shakun
New England Forestry... Read more

Forum topic

Hi, all. We missed you at the standing check in today. We have a couple of questions for the BG team:

1. What is the timing criteria you need for Best Practice content? We need to back into a deadline on submissions and believe your critical path timing will help define ours.

2. Can you elaborate on what LEED User/BG content may... Read more

Forum topic

Hello Sustainable Construction Leaders,

Save the date! The network's next quarterly call is scheduled for 1pm ET (10am PT), Tuesday November 16th. Topic TBD. Steering Group member Emi LaFountain from Turner will be leading the conversation.

Keep an eye on this thread for more details and Zoom information.

Jen

Forum topic

Friends of EPIC –

Hey, everyone. As some of you might have heard, we’ve been working for a while with Autodesk to get c.scale (the data model behind EPIC) built into Forma – Autodesk’s AI-powered planning tool. Forma is packaged within Autodesk’s AEC collection and most firms using Revit should already have access. This integration is... Read more

Forum topic

Hi folks,

I'm looking into lower-carbon pipe options for HVAC and plumbing. The MEP 2040 has slides from a Buro Happold study in 2020 showing PEX to be much lower in embodied carbon than copper, which is unsurprising. CPVC is also a lower-carbon option.

But PVC has its issues and neither PVC nor PEX are recyclable (especially if... Read more

Product Guide

Hardware has to be durable and resist weathering to ensure that features such as doors function properly.

BuildingGreen-Approved Hardware

BuildingGreen approves hardware that uses post-consumer recycled metal content beyond what is standard in the industry. Products from manufacturers that have engaged in information transparency... Read more

Quiz

Welcome to the quiz portion of Net-Zero Energy Isn’t the Real Goal: 8 Reasons Why!

Learning Objectives
Upon completing this course, participants will be able to:


Describe why focusing on carbon instead of on energy at the building scale is a better choice for the environment. Name eight reasons why net-zero-energy buildings... Read more

Forum topic

Team,

Many of you saw this from BlackRock.

https://www.blackrock.com/corporate/investor-relations/larry-fink-ceo-letter

SOM, starting with London office, is drafting a letter to our MEP consultants, demanding and holding them accountable for climate change as a preference on consultants selection.

Best,
LL 

Forum topic

Hi all,

We have a newly constructed, core/shell project having some hot water issues in the core restrooms.

There is a 0.35 Toto lav installed throughout. The hot water heaters are adjacent on each floor, located in the janitor closets. We did the math, and there could be a gallon of water standing and cooling in the pipe between... Read more

Forum topic

We have an MEP engineer that is calculating peak loads at about 6 times passive house levels on a large commercial building that is at or near passive house levels of insulation and air infiltration. We suspect one reason is that he is figuring a 50% efficiency level for the ERV. We are showing him ERV systems with 80-90% efficiency, but they... Read more

Quiz

Welcome to the quiz portion of Improving Resilience!

IMPORTANT: This quiz covers five related articles within this topic. 

Learning Objectives
Upon completing this course, participants will be able to:


Discuss resilient design options that prioritize safety, health, and emergency preparedness in the wake of disasters... Read more

Forum topic

Love books? Want some inspiration? Join this Goodreads group with the following link... 

https://www.goodreads.com/group/invite/873351-green-gurus-goodreads-grou... (this link will be active for 30 days so let me know if you get here late and need it again)

I set this up as "private" so I will need to approve you. Anyone will be... Read more

Forum topic

Hi SDLers! I hope early fall is finding you well.

There is a current opportunity to make a difference in the campaign to reduce use of toxic flame retardants.

Arlene Blum and the Green Science Policy Institute, whom many of you know, are currently organizing a campaign of support for the CA State Fire Marshal's proposal to allow... Read more