Forum topic
Hello,
We are in the very early planning phase of a k-8 public school project to be designed and built in an economically challenged urban location with very limited site options. The project is not LEEDv4 registered yet. We are at feasibility and costing the soil remediation, needless to say that we would really hope there would be... Read more
Product Guide
Many wood panels are unsustainably sourced, and some have high formaldehyde emissions.
BuildingGreen-Approved Panels
Laminate panels approved by BuildingGreen:
use substrates that meet CARB Phase 2 ultra-low-emitting (ULEF) or no-added-formaldehyde (NAF) emissions requirements and contain FSC-certified wood content or... Read moreForum topic
Hi all - we have several projects where money from the IRA may be able to get projects farther. I've seen the AIA/USGBC webinar and done some other research as well. Does anyone know if there's a Higher Ed group that is chasing down how and when the money is available and for what exact purposes? Are you planning on using consultants to help... Read more
Reports, Courses, Study Guides, Live Webinars
THIS WEBINAR PURCHASE AND REGISTRATION IS CLOSED.
This webinar occurred on Tuesday, September 27, 2022, 2pm EasternThe new “Contractor’s Commitment to Sustainable Building Practices" calls on firms to practice green building on the jobsite and beyond. But what has really been accomplished during the program's... Read more
Forum topic
We had so much fun at our Contractor coffee talk that I reached out to our MEP friends to see if they would set up something similar. And they have agreed to host a talk on Thursday December 2, at 1-2pm EST. They will talk about decarbonizing buildings, on a schedule that keeps us under the 1.5° C limit and will also address strategies for... Read more
Forum topic
Hey Everyone!
We are delighted to share a major milestone in our commitment to sustainable design. After two+ years of intensive research, refining, and internal application, NBBJ is thrilled to announce the external launch of ZeroGuide, an innovative tool for early-phase carbon estimation, now available to the entire AEC community!... Read more
Forum topic
Hi Sustainability Leaders,
(Note: this post was edited to correct Jen's affiliation and to add Rob Winstead.) Please join me and the BuildingGreen team in congratulating the Peer Network members of the USGBC 2023 Class of LEED Fellows!
Geoffrey Brock, IPS-Integrated Project Services, SCL
Heather DeGrella, Opsis... Read more
Forum topic
Team,
See this paper regarding outside air vs. filtration.
https://www.sciencedirect.com/science/article/pii/S0360132313002515
MERV-13 is a good way to get most benefits without a huge cost.
Best,
Luke Leung
Quiz
Welcome to the quiz portion of New Concepts in LEED v4.
Learning Objectives
Upon completing this course, participants will be able to:
1. Recognize the ways in which the Integrative Process credit requires teams to analyze opportunities early in design.
2. Describe how the new Location and Transportation... Read more
Forum topic
We are attempting to use Tally on a couple projects and are wondering how others are using the tool in their design process. If any experienced users out there would be willing to have a brief phone conversation I would appreciate it. Thanks
Forum topic
Hi All,
If you have 5 minutes, we would appreciate your input in the Google Spreadsheet (linked below). If you only have 1 minute, feel free to reply to this forum post and list your the typical equipment vendors you spec on projects. :)
We're asking each of you to enter your "Top 3" specified vendors for each of the products... Read more
Forum topic
This would be a great place to share insights and reflections from the opening session.
Forum topic
I would be interested to hear which parties in our group have participated in the CDP Program and how you are reporting your efforts. I have talked to several contractors that just submit the data for their offices. I always feel like it is asking about our operations including the jobsites, and wonder how you get there. I am very much... Read more
Forum topic
I am looking for examples of adaptive reuse projects that have addressed current or future flooding by elevating floors from the existing condition.
Forum topic
Something we seem to be seeing a lot in our market recently are projects split into multiple packages - footing / foundation, C&S, and then later a TI package of CD's... mostly in an effort to speed up permitting and construction schedules. (Oftentimes with a contractor on board for a design / build approach).
My question to the... Read more
Basic page
Testing web-to-lead to existing contact in Salesforce.
function timestamp() { var response = document.getElementById("g-recaptcha-response"); if (response == null || response.value.trim() == "") {var elems = JSON.parse(document.getElementsByName("captcha_settings")[0].value);elems["ts"] = JSON.stringify(new Date().getTime());document.... Read more