BuildingGreen Report

Forum topic

Hey y'all,

Since it's now past September 8 when reporting was due, I'm thinking all those that were going to report as part of this round have now done so. I know AIA will assemble an industry-wide report, but I'm also very interested in the less polished conversation that allows all of us to trade experiences and just see how this went... Read more

Product Guide

Composite windows come in two basic types: fiberglass, and wood/plastic composite.

BuildingGreen-Approved Windows

Fiberglass and other composite window lines have NFRC unit U-factors of 0.20 or lower. Higher U-factors are allowed for products that include significant recycled content.

Manufacturers also must demonstrate... Read more

Forum topic

The Planning for Resilient Outcomes Working Group has had a few preliminary meetings and we would like to invite interested Green Gurus to join our group.  To give you an idea of what we are about, we have developed a purpose statement to guide our future work: 

The Planning for Resilient Outcomes working group will elevate the industry'... Read more

Forum topic

Hi All,

Attached is the DRAFT of our ZNE Data Report.  It is just the beginning. We have a lot more data to gather.  We didn't want to wait for it to be perfect to get it out. Hopefully this gives you all an idea of where we are headed.  Please continue to send us your projects in the Northeast.  I've also attached the excel doc for you... Read more

Forum topic

Blast from the past when 179D first hit the scenes.

Are any of you still using this and if so, has it been easy, successful, worthwhile etc

and Happy New Year !

Forum topic

We are working on a Core & Shell project with a developer that we work with frequently. I'm looking for advice on best approaches to achieving the Whole Building Life Cycle Assessment credit- we haven't used TALLY and done this type of analysis before. What are some approaches to achieving this credit that others have found successful? I... Read more

Peer Network Event

Forum topic

After reviewing BP language today with internal staff, we realized we'll need to add a glossary to explain industry jargon and technical terms that might not be widely used. I'd like to consolidate those terms onto one web page, a glossary. This probably should be on the list with the best practices, and it will need its own page. Thanks!

Quiz

Welcome to the quiz portion of Changing Building Design Priorities for a Changing Electrical Grid!

Learning Objectives
Upon completing this course, participants will be able to:


Define a “Highly Variable Renewable Energy” generation asset, or VRE, and understand how VREs can most effectively contribute to the... Read more

Forum topic

We're now mid-way through Summer Summit season! One of the “good problem to have” challenges we’ve had at recent SDL Summits has been too many great five-minute presentations. It’s hard to find time for them all. This year, since we’ll be online anyway, we can get a jump on that by starting the five-minute presentations early in addition to... Read more

Forum topic

Our firm has had some clients that object to the term "Master Plan." We have removed "Master Planning" from our letterhead, where we list our capabilities and have replaced it with "Planning." Although we still find ourselves using it, old habits die hard, especially when we receive an RFP from a client asking for "Master Planning." Once we get... Read more

Forum topic

Hello all,

We are looking at ways we can use our specs to reduce toxicity in projects and one step towards that goal may be to require RoHS compliant lighting, switches, alarms, meters, etc., as required by the Small Electrical Components exception in the Living Building Challenge. Based on LBC projects I have been involved with, it... Read more

Forum topic

As you might well remember, one of the Working Groups that came out of the SummitPalooza earlier this year was for MEP Embodied Carbon & Refrigerants.  That Working Group began working with the Carbon Leadership Forum and is now excited to announce the rollout of the MEP 2040 Challenge: “All systems engineers shall advocate for and achieve... Read more

Forum topic

Check out Fast Company's new list of innovative architecture firms with Perkins + Will and NBBJ at the top with great sustainability tag lines. 

That's a great demonstration of the mainstream importance of sustainability!

Congrats to all.

Here's the link: https://www.fastcompany.com/most-innovative-companies/2018/sectors/... Read more

Quiz

Welcome to the quiz portion of Video: Making the Green Insulation Choice for Your Project.

Learning Objectives
Upon completing this course, participants will be able to:


 

1. Discuss how insulation works.
2. Explain why certain materials make more sense than others in particular applications.
3. Summarize... Read more

Forum topic

Dear Colleagues: A climate scientist family member who I respect deeply shared this youtube with me. I thought it was worth sharing with all of my GreenGuru friends. Let's keep on keeping on!

https://www.youtube.com/watch?v=LxgMdjyw8uw

cheers

Mary Ann

Reports, Courses, Study Guides, Live Webinars

THIS WEBINAR PURCHASE AND REGISTRATION IS CLOSED.

This webinar took place Thursday, Nov 8th at 2:00 pm Eastern Time (11:00 am Pacific).

Join Brent Ehrlich and Alex Wilson to learn about the ten most exciting green products for 2019. Every year for the past 17 years, BuildingGreen has selected ten green... Read more

Forum topic

Hey All,

I wish I could brag about the tremendous success Integrus has had in conducting a robust LCA on every project.  Our goal is to use Tally to conduct a WBLCA on every project, but we are struggling with issues with staff time, project schedules, scarcity of expertise, and not having a streamlined process to produce reliable... Read more

Product Guide

CEUs are available for reading all the building-envelope product guides and primer. Click here to learn more and take the quiz.

Wall assemblies are made up of a number of different materials and systems, and installing each of them requires considerable time and labor and can introduce errors that compromise the building’s weather... Read more