Forum topic
Hi All,
How are folks funding training for your employees? Would it help to have free training opportunities besides lunch and learns or ones you do yourself?
For those of you outside of Massachusetts you may have employees or friends in MA that this could be relevant to. I'm hoping my friends in MA have already heard this.
... Read moreForum topic
Hello Green Gurus,
A close colleague of ours, Frances Yang of Arup, is distributing a survey developed in partnership with the Healthy Building Network (HBN).
The survey asks for which product categories you need more health information. Answers will help inform which product categories HBN next incorporates into its HomeFree and... Read more
Forum topic
Hello! Does anyone know of any general contractors who produce a CSR? Is anyone aware of any general contractors who have an ESG rating? If so, what company is being utilized (i.e. EcoVadis) to get the ESG rating?
Product Guide
Board insulation has good thermal performance ranging from about R-4 to R-8 and is used as an integral part of a building envelope’s continuous insulation system.
Because board insulation is used on the building exterior, it is not always subject to the same material health and emissions requirements as batt insulation used inside the... Read more
Forum topic
Hi there,
We know some of you have been vetting the Contractor's Commitment within your company and are eager to sign up. Good news--enrollment is now live on the website! Download the form by clicking 'Sign the Commitment' on the right sidebar and return it to me with your logo. Any bets on who will sign up first?
https://www.... Read more
Forum topic
Hi MEP Leaders!
Here's a reminder that our monthly meeting is coming right up--today at 2:00 pm ET.
There is a lot to talk about: James has put together a starting point for our "how to make the best use of your engineer" guide. And Summit plans...
You can view the agenda here.
All members of the SMEPL network are... Read more
Forum topic
Hi friends,
We recently tracked our water consumption on site during the structural demolition of some existing reinforced concrete buildings. The new OSHA silica regulations required us to keep dust to virtually zero, so we had a bunch of mist cannons and water hoses pumping water around the clock. We consumed ~855,000 gallons in a... Read more
Forum topic
Does anyone have a draft copy of the ASHRAE 209P standard? It has not been finalized? See an overview of it here from IBPSA 2016 summer meeting.
The 209 committee plans to release it for a 3rd public review and hopes to finalize it in late winter or early spring. I'm just trying to track down one of the earlier verisons of the document... Read more
Forum topic
The Water Sub-Group met today. This group is working on three items:
1. Project Water Plan Template
2. Project Water Tracking Form Template
3. Research and Resources Document
The Meeting minutes are attached. The next meeting is 5/19/20 @ 2:30 PM CST, via webex and teleconference. Please contact me if you would... Read more
Forum topic
Hi all,
We have a project in New Orleans that needs to meet the GSA Inflation Reduction Act (IRA) requirements and submit EPDs. For our concrete, there is only one manufacturer that meets the requirements and is more than 50 miles away (according to EC3). Does anyone have tips on attempting to talk to local concrete manufacturers about... Read more
Forum topic
Hello there,
I am working on a project with indoor plants and active green walls. I would like to design lights for growing plants and people at the same time (which seems to be a non-obvious problem).
I was thinking of Philips, GE, Shneider Lighting, etc. Would you recommend someone I could talk to and eventually engage... Read more
Basic page
A building project brings brothers back together, but a fast-moving storm challenges the project and the family.
Of storms & chins »
Whistleblowers alert state health agencies to possible foot fungus scourge... Read more
Forum topic
Does anyone know where one can locate weather files (EPW) that has predicted future data for climate change?
Thanks in advance.
Forum topic
Reminder: For anyone interested in continuing to participate in the Climate Smart Wood Working Group, please note that we have joined the other CSWG and will have our first meeting next Wednesday. Visit the Working Group page for the meeting invite and agenda.