BuildingGreen Report

Product Guide

An elevator system can account for 4%–10% of a building's electric energy load, without considering impacts on heating and cooling. Conventional finishes are also common.

BuildingGreen-Approved Systems

We approve the most efficient tension elevators from leading manufacturers, including models that incorporate:

regenerative... Read more

Team Group

Forum topic

Hi All,

USGBC MA is doing a study on the cost of net zero energy buildings in MA.  I’m wondering if you all have any data to share on plug loads in ZNE projects. I’m looking for single family res, 2-4 unit residential, +/- 60 unit residential, 10-12 story office, and k-12.  The engineers have presented initial results and their... Read more

Forum topic

Small Firm Sustainable Design Leaders –

I find it hard to believe calls for session proposals are already out for next year’s AIA Conference on Architecture.  I feel like I just got back!

At my firm, we try to have all principals and associates to submit a proposal each year.  I had a couple of take-aways from this year’s... Read more

Author

Poppy Gasbag

Forum topic

Hello all,

Does anybody know of a substitute for Ecotect's solar tool? I use it to very quickly test shade options and I love how I can easily test horizontal and vertical elements, tilting and rotating them. I can have a window with the façade on one side and the sun path with the shadow mask on the other side. It is easy to use and... Read more

Forum topic

Hello Green Gurus!

ILFI’s annual Living Future Conference is coming up, so we thought we might host a (virtual) Show & Tell session of 5-minute versions of peer network members’ presentations like we often do in conjunction with Greenbuild. First we want to see if this is of interest to you all. Please take 30 seconds to let us know... Read more

Forum topic

Please see the following invite from Professor Alexandra Rempel at the University of Oregon to participate a 15-20 minute phone/Zoom interview and share your experience and/or perceptions on the problems, challenges, and barriers to incorporating into your projects.

This effort is part of an NSF research grant that I am involved in and... Read more

Campus-wide Group

Forum topic

I was talking to Nadav recently about job posting opportunities through Building Green and/or through the Peer network.  He shared this topic has been discussed in the past, and thought I should send a question out to the network.  I am guessing many of you are looking for talent right now too?  Wouldn't it be cool to know people of have been... Read more

Forum topic

Hi All, 

My understanding is that SCL reporting is only for refrigerant use, or recharging for headquarters. I've asked our MEP contractor for a list of our 21 units, refrigerant use, and what quantity of refrigerants were used to charge equipment during installation or service.  

Is anyone tracking this for job sites?... Read more

Forum topic

Good morning, All,

Just a bit of news this morning.  My family and I are moving back out west!  I am continuing in my current role with EwingCole, but will be doing so from Portland, Oregon.  Although North Carolina has a been a wonderful place for us for the past 13 years, it is time to be close to family in the northwest and southwest... Read more

Forum topic

Hi there colleagues!

Out of curiosity, do you plan on attending Greenbuild in person in San Diego in September? My staff asked me if we were going and my answer is partially contingent on the extent to which attending would mean getting to see some of our favorite people (read: all of you). Looking forward to taking the temperature of... Read more

Product Guide

Caseworks can be made from unsustainable wood and other materials, and with adhesives and finishes that offgas formaldehyde and other hazardous compounds.

BuildingGreen-Approved Casework

Approved caseworks are:

made from FSC-certified wood or rapidly renewable materials verified as low emitting using CDPH Standard Method or a... Read more

Forum topic

We have an MEP engineer that is calculating peak loads at about 6 times passive house levels on a large commercial building that is at or near passive house levels of insulation and air infiltration. We suspect one reason is that he is figuring a 50% efficiency level for the ERV. We are showing him ERV systems with 80-90% efficiency, but they... Read more

Quiz

Welcome to the quiz portion of Video: Insights to Success on LEED-CI Certification.

Learning Objectives
Upon completing this course, participants will be able to:


 

1. Identify key changes to LEED CI 2009 (ID+C).
2. Identify the circumstances of a LEED-CI project that challenge the abilityto certify.
3.... Read more

Forum topic

Hi all!

I've heard several people talk about developing tools for assessing/codifying a client's values for a project as part of an integrated design process (ie. a set of questions, survey, etc.). Would anyone be willing to share?

(Z, are you listening? I specifically recall you mentioning a tool like this...)

Thanks!... Read more