BuildingGreen Report

Quiz

Welcome to the quiz portion of The Great Eight: High-Impact Material Choices for Green Building.

Learning Objectives
Upon completing this course, participants will be able to:


1. Specify green building materials in product categories that truly make a difference for human health, the environment, or both.
2. Conduct a... Read more

Forum topic

The results from the "CogFx" study are compelling, showing that people in environments with low VOCs and low ambient CO2 levels score higher on tests of cognitive function.  Specifically, they show that providing 40cfm of outdoor air per (actual live) occupant results in significantly higher scores than even the "Enhanced Ventilation" scheme... Read more

Forum topic

Hello all,

I need future weather files for a project. We are looking at three years, 2050, 2075, and 2095 using two climate change scenarios, low emissions, and high emissions. I have seen ARUP's Weathershift site that uses RCP 8.5 and RCP 4.5. Are we assuming that 2.6 is not achievable? I would have used this as a low emissions scenario... Read more

Campus-wide Group

Forum topic

Hi all,

Thanks again to those who presented at the AIA Show & Tell! Here are the slides for some of the fascinating presentations we saw. Please do not share the slides outside of the networks unless they are marked “PUBLIC.”

There may be more to come; if you presented but did not yet provide permission for your slides to be... Read more

Forum topic

Does anyone have a "healthy material" exterior bleacher benchtop (beyond natural wood or metal) recommendation for a public high school track and field? 

How do we discern between fiberglass, recycled plastic or HPDE?  Is there a rule of thumb on how to advocate for specifying a "not as bad" material? 

The project is in a coastal... Read more

Forum topic

On LEEDuser we divide checklists into multiple project phases. Specifically:

Before the performance period Construction Construction documents Design development During the performance period Operations & maintenance Pre-design Schematic design

How many of these phases are relevant for BIT best practices?

Note that we also... Read more

Forum topic

I'm working with a project team that is looking into bird control options to prevent nesting/roosting/pooping on the scrim that is designed to scrim their building's facade.  They are looking at electrified tape, repellents, laser systems, etc -- Options that don't dramatically impact the building design.  The products they're looking at claim... Read more

Forum topic

Is LEED Online mind-numbingly slow today for anyone else? Or is it just me? I may give up and try again tomorrow. Frustrating as I was hoping to submit a final review today. :(

Forum topic

Hello Green Gurus,

A close colleague of ours, Frances Yang of Arup, is distributing a survey developed in partnership with the Healthy Building Network (HBN).

The survey asks for which product categories you need more health information. Answers will help inform which product categories HBN next incorporates into its HomeFree and... Read more

Quiz

Welcome to the quiz portion of Essential Playbook to Managing LEED Construction.

Learning Objectives
Upon completing this course, participants will be able to:


1.  Understand the transition from LEED BD+C or ID+C v4 to LEED v4.1, especially in regard to material-related credits.

2. Discern how to properly... Read more

Author

Shamus Gumshoe

Forum topic

Overland Partners is looking for a Sustainable Design Analyst with 2+ years of experience working with teams to implement sustainability strategies and building performance simulation. 

More details here: https://www.overlandpartners.com/careers/sustainable-design-analyst/ Please pass along if you know of someone who may be a good fit... Read more

Forum topic

Hey group,

I'm part of the contractor team on a large commercial project pursuing LBC v3.1 Petal Certification, with one of those petals being materials. This requires the team to meet Imperative 10 Red List.

The ownership group has taken the responsibility of red list vetting as a task of their own. The construction team is to... Read more

Product Guide

Board insulation has good thermal performance ranging from about R-4 to R-8 and is used as an integral part of a building envelope’s continuous insulation system.

Because board insulation is used on the building exterior, it is not always subject to the same material health and emissions requirements as batt insulation used inside the... Read more

Forum topic

Hello! Does anyone know of any general contractors who produce a CSR? Is anyone aware of any general contractors who have an ESG rating? If so, what company is being utilized (i.e. EcoVadis) to get the ESG rating?  

Author

P.J. is an accomplished writer and speaker who brings passion, humor, and discernment to all her work.

Whether it’s a spotlight report on decarbonization, a webinar on ESG, or just a chummy email bulletin, she is ferociously committed to truth, accuracy, and thoroughly... Read more

Forum topic

Hi all, 

Internally in our organization, we seem to have plenty of horizontal (infrastructure) resiliency expertise, but I'm finding the vertical resources to be lacking. I'm hoping to build a collection of beginner- to intermediate-level resources to help guide practice/design standards for our reference. Any pointers on good info... Read more