BuildingGreen Report

Forum topic

Great meeting everyone and very excited to work with you all.  Reminder about Tuesday night's homework assignment to support Sachin's efforts to upgrade the quality of our AE pipeline:  tell us why you got into this business.

While I was an undergraduate engineering physics major*, I had a partime job at a farm implement manufacturing... Read more

Quiz

Upon completion of this course, participants will be able to:

Be aware of key dates in the history of the LEED rating system.

Have a clear understanding of the new impact areas present in the updated rating system.

Ascertain which types of new credits belong to which impact areas in the LEED v5 rating system.

... Read more

Quiz

Welcome to the quiz portion of Materials Transparency & LEED.

Learning Objectives
Upon completing this course, participants will be able to:


1.  Describe the documentation needed for products to meet the Building Product Disclosure and Optimization: EPDs credit, Option 1 in the LEED v4 BD+C and ID+C rating systems.... Read more

Forum topic

We are having trouble sourcing a LEED compliant wallcovering adhesive. We specified Roman Pro-880 which is low VOC but doesn't have sufficient back up for TVOCs. Have you had success with other products?

Firm-wide Group

Forum topic

We have an MEP engineer that is calculating peak loads at about 6 times passive house levels on a large commercial building that is at or near passive house levels of insulation and air infiltration. We suspect one reason is that he is figuring a 50% efficiency level for the ERV. We are showing him ERV systems with 80-90% efficiency, but they... Read more

Forum topic

Hello,

Are you seeing any traction with LEED v4 O+M: Transit?

Cheers, Mona

Team Group

Forum topic

Hi All,

Has anyone dug into ASHRAE 2016 as part of the new v4.1 requirements or as codes start to adopt it? I recently presented on this and thought I should check my math to make sure I'm understanding and communicating this correctly.

My understanding is that there is a new reference baseline, that is essentially the ASHRAE 2004... Read more

Forum topic

Hello - 

I am looking for the recording and the PDF/ slides that were shared 3/6 for the project process share-out/ 5 min presentations. It was super inspiring and I would like to refresh my memory of some of what was shared. Thank you!

–
Alison Nash 
AIA, LEED AP ID+C, CPHC, WELL AP
Associate | Sustainability... Read more

Product Guide

People tracking pollutants and dirt into buildings can cause indoor environmental quality (IEQ) problems, increase maintenance costs, and reduce the life of the floor. When they track rain and snow on hard surfaces, it increases the risk of personal injury due to slips and falls.

BuildingGreen-Approved Track-Off Systems

... Read more

Forum topic

Greetings to all of the AEC SD Leaders (a.k.a. the Green Gurus)!

Over the last two months, the 32-member Build-Back-Better (BBB) letter working group has developed a robust list of first 100-days, built-environment-focused executive actions for the Biden administration to consider. Kara Kempski, the AIA’s Director of Federal Relations,... Read more

Forum topic

All,

I recently met Sahil Tadwalkar who is a Stanford MS Candidate in Civil Engineering. He and his group are interviewing design and construction industry professionals to understand issues and challenges around specifying and using low carbon solutions on projects. Interesting stuff! I encourage you to contribute by setting up an... Read more

Forum topic

On a large sports project, we worked with the structural engineer to spec low carbon / high SCM concrete mixes. Much of the floor area will be sealed and polished concrete, and a concrete sub is pushing back on the SCMs saying they should not be above 20% (with a preference for 0%) for the polish to finish properly, per the manufacturer. Anyone... Read more

Forum topic

"The man with one watch knows what time it is; the man with two is never sure."   --Segal's Law

We recently purchased two indoor air quality meters in the $200-$300 range and find that they never agree, not even close. I would like to find out what other people's experiences have been, and if they have tested affordable models that... Read more

Forum topic

Hi everyone! I'm extremely pleased to be back in this group after a couple of years out and I'll spare no time in spamming your inboxes. 

MASS is working with UT Austin to help them evaluate their campus buildings for reuse firstly and then deconstruction and material reuse. Their campus, as with most campuses, is constantly being built... Read more

Forum topic

This article just came up in my news feed. I thought you’d all like to read it. I will point out that C&D-specific MRFs have told me that they are really good at single-stream C & D waste, as long as the drywall is pulled out.  Any drywall in a single-stream C & D dumpster ends up in the landfill. Drywall just breaks apart and gets... Read more

Quiz

It may take hundreds or thousands of years to return to pre-industrial-age levels of atmospheric carbon dioxide, but the loss of animal and plant species that is occurring today is, practically speaking, irreversible. It will take millions of years for evolution to fill the ecological niches being vacated by extinctions and restore healthy... Read more