Quiz
Welcome to the quiz portion of Rethinking the All-Glass Building.
Learning Objectives
Upon completing this course, participants will be able to:
1. Describe eight reasons all-glass buildings are so popular in architecture today.
2. List the four elements Arup examined in their modeling of the effect of... Read more
Forum topic
Does anyone know about temporary flushout equipment that could be used to augment a building's systems to get additional CFM of OA during construction? For our non-laboratory type projects the flushout period ends up being too long, especially in either humid summers or frigid winters (Pennsylvania).
Hoping that some of you on either... Read more
Quiz
Welcome to the quiz portion of Designing for Future Weather (recorded webcast)
Learning Objectives
Upon completing this course, participants will be able to:
1. Understand the science of climate-change predictions.
2. Stay abreast of changing climate models.
3. Learn how to make use of future weather... Read more
Forum topic
A question for you, all input appreciated: What are some metrics and data points you all use to report out to your staff and leadership? I'm starting on higher-level analysis of our projects' performance by typology and through other lenses, and I wonder if you have found metrics or reporting points that are particularly impactful in your... Read more
Forum topic
Fellow SCLers,
This is a small ball item, but I recently had a conversation with a safety glove manufacturer called Traffi. They make PPE, but in particular they have a line of gloves that they promote as carbon neutral. Their organization's operations are offset with retired RECs, but one line of their gloves, LXT, is offset by a... Read more
Forum topic
Does anyone have a recommendation for software that helps organize and track product and material selections for projects?
Thanks!
Forum topic
I would be interested to hear which parties in our group have participated in the CDP Program and how you are reporting your efforts. I have talked to several contractors that just submit the data for their offices. I always feel like it is asking about our operations including the jobsites, and wonder how you get there. I am very much... Read more
Forum topic
Has anyone submited this credit in lieu of demand response before? I'm attempting on multiple projects but not sure what to expect review wise or how much confidence to have in the ability to get more than 1 point for trying.
https://www.usgbc.org/credits/gridoptimal-152-v4?return=/credits/New%20C...
Quiz
It may take hundreds or thousands of years to return to pre-industrial-age levels of atmospheric carbon dioxide, but the loss of animal and plant species that is occurring today is, practically speaking, irreversible. It will take millions of years for evolution to fill the ecological niches being vacated by extinctions and restore healthy... Read more
Forum topic
Well done and rivhly deserved, brother. That makes you a Fellow Squared.
Forum topic
Call for Reviewers and Call for Proposals now out. If you're not planning on submitting a proposal to present, please consider volunteering as a reviewer, subject matter expert or member of the Program Working Group. The quality of the education program is directly proportional to the people who select it!
See many of you in Alabama... Read more
Forum topic
Hi All: We are in the design phase for a 5,700 SF project in NH. The team is taking care to drive down embodied carbon where possible. It will be NZE.
A1-A3 emissions are coming in at 67.15 kgCO2e/sf, of which 11.97 kgCO2e/sf is a hot spot attributed to permeable paving and concrete pavers (a little skewed, since lot and patio sizes... Read more
Forum topic
Show & Tell Break-out Session: Post Occupancy Evaluations and Occupant Behavior
Presentations:
Preliminary findings from our first year of data collection. Measured results in WELL Stories about visiting our past clients and teaching them about their energy use habits.Product Guide
CEUs are available for reading our entire plumbing guide. Click here to learn more and take the quiz.
Constructed wetlands and other natural filtration systems close the nutrient and water loop, permitting safe and sustainable wastewater treatment and reuse right on the site.
BuildingGreen-Approved SystemsWe look for... Read more
Forum topic
Hey Team,
I'm in a Living Future session where a number of manufacturers are talking about the low uptake they're seeing in their take back programs. Contractor friends... What barriers (if any) are you running into in using take back programs? How might we as architects help increase utilization of these programs?
Aley
Forum topic
Hi all -
I got this yesterday from Renew Oregon, a credible environmental NGO here in the state.
"A secretive special interest group has filed a petition at the Federal Energy Regulatory Commission (FERC) to take “net metering” rules away from states and make it a federal issue. Net metering is the program that allows homes and... Read more