BuildingGreen Report

Forum topic

Checking in to see if any of you have had good job site success with plastic water bottle recycling. Due to the LBC recycling requirements, we have to source separate onsite, and we're trying to has a separate plastics bin. For the most part, water bottles is going to be on of our biggest contributors.

Peer Network Event

Forum topic

Hello Green Gurus,

Here is the information for our second Peer Networks Webinar this month, coming up next week: Better Products = Better Buildings (Low Carbon Specs). We hope you can join us!

Register HERE.

Better Products = Better Buildings (Low Carbon Specs)
Thursday, May 19, 2022
1 - 2pm ET (10 - 11am PT)... Read more

Forum topic

Does anyone have a "healthy material" exterior bleacher benchtop (beyond natural wood or metal) recommendation for a public high school track and field? 

How do we discern between fiberglass, recycled plastic or HPDE?  Is there a rule of thumb on how to advocate for specifying a "not as bad" material? 

The project is in a coastal... Read more

Quiz

Welcome to the quiz portion of Cool Products from the Latest Greenbuild Expo.

Learning Objectives
Upon completing this course, participants will be able to:


 

1. Describe innovative products for HVAC and the building envelope.
2. Describe innovative products for saving water and managing stormwater.
3.... Read more

E-Product Display

Forum topic

Hi Gurus,

It seems odd to think about leases now, during a time when most business are giving up leases or reducing their footprints, but there are still leases going on! Please share this link to any clients of yours who might be interested and sign up yourself if you want to advocate to your clients to consider these leases!

... Read more

Basic page

General FAQs

What is BuildingGreen? What is BuildingGreen Premium Membership? I have lost or forgotten my password How do I renew my BuildingGreen premium membership? How do I cancel my auto-renewing membership? Can I get a refund? How to receive notification of new BuildingGreen content

Orders, Memberships and Billing

Technical... Read more

Campus-wide Group

Forum topic

Hi all,

Thanks again to those who presented at the AIA Show & Tell! Here are the slides for some of the fascinating presentations we saw. Please do not share the slides outside of the networks unless they are marked “PUBLIC.”

There may be more to come; if you presented but did not yet provide permission for your slides to be... Read more

Forum topic

Hello! 

We have several projects that are either pending ILFI Zero Carbon certification or the owner is planning to purchase offsets to cover construction emissions. Thus far, I have not considered this in our corporate footprint reporting. However, we are including A5 emissions whenever feasible and multiplying that performance over the... Read more

Forum topic

Looking for an example or case study for a building utilizing a radiant heating/cooling in climate zone 4a. General use type is office with some public assembly spaces, total of 85,000 sf.

As usual, everyone, especially mechanical engineer, is terrified by the thought of "condensation." So far, I read a DGWW case study, "Energy... Read more

Forum topic

I'm looking to compile an outdoor weather station for a local project, and we'd like to add local outdoor CO2 information to our data. I usually work with Onset HOBO products, but they don't offer an outdoor CO2 sensor. Their weather stations can take data from any CO2 sensor with an analog output - does anyone have any suggestions?

Author

Anne Hicks Harney, FAIA, has more than 30 years of experience, focusing on high-quality design imbued with a solid technical and sustainable foundation. At Long Green Specs, she provides sustainability-focused construction specifications and building material expertise to architectural firms across the country. She was chair of the AIA... Read more

Forum topic

On LEEDuser we divide checklists into multiple project phases. Specifically:

Before the performance period Construction Construction documents Design development During the performance period Operations & maintenance Pre-design Schematic design

How many of these phases are relevant for BIT best practices?

Note that we also... Read more

Forum topic

I'm working with a project team that is looking into bird control options to prevent nesting/roosting/pooping on the scrim that is designed to scrim their building's facade.  They are looking at electrified tape, repellents, laser systems, etc -- Options that don't dramatically impact the building design.  The products they're looking at claim... Read more

Forum topic

Hi All,

Has anyone successfully adopted a Revit to ClimateStudio workflow with their new export tool? Right now we are using cove.tool because it works reasonably well with iterative Revit modeling, but are itching to try a more accurate and nuanced alternative.

Thanks for any and all experiences!
Misha