BuildingGreen Report

Product Guide

Ventilation is essential for indoor air quality, but it can bring very hot or very cold outdoor air into conditioned space.

BuildingGreen-Approved ERVs

Heat-recovery ventilators (HRVs) and energy-recovery ventilators (ERVs) can save energy by capturing nearly all of the heat in the air being exchanged. BuildingGreen approves:... Read more

Forum topic

On behalf of the LFRT IRA working group, I am writing to see if anyone has applied for IRA funding (48E, 45L, 179D) for their project, and is willing to share their experiences and basic project info with us.  We can keep the project name confidential if needed.

Thank you!

Author

Forum topic

A couple Minnesota cities are considering adding electrification to their sustainable building policy (required for new construction receiving City financial assistance). Concerned that the market isn't ready for a full-on mandate, they are considering a more moderate approach of requiring developers/design teams to conduct an electrification... Read more

Forum topic

Hello all,

I need future weather files for a project. We are looking at three years, 2050, 2075, and 2095 using two climate change scenarios, low emissions, and high emissions. I have seen ARUP's Weathershift site that uses RCP 8.5 and RCP 4.5. Are we assuming that 2.6 is not achievable? I would have used this as a low emissions scenario... Read more

Forum topic

Looking for an example or case study for a building utilizing a radiant heating/cooling in climate zone 4a. General use type is office with some public assembly spaces, total of 85,000 sf.

As usual, everyone, especially mechanical engineer, is terrified by the thought of "condensation." So far, I read a DGWW case study, "Energy... Read more

Forum topic

How interested are you in a Sustainable MEP Leaders Summit this summer? 

Please respond to this poll ASAP, as we need to gauge interest before we finalize any details.

When: Wed. July 26 at noon to Thurs. July 27 at 1:30. 
Where: At a conference facility near Boston
Cost: $1200, which includes lodging, meals, and... Read more

Forum topic

On LEEDuser we divide checklists into multiple project phases. Specifically:

Before the performance period Construction Construction documents Design development During the performance period Operations & maintenance Pre-design Schematic design

How many of these phases are relevant for BIT best practices?

Note that we also... Read more

Forum topic

Hi all,

We are looking to study Passive House on a couple small multifamily projects. Our understanding is that WUFI Passive only integrates with SketchUp at this time. Our BIM manager has been trying to find an example of a firm that works in Revit and uses WUFI Passive, to point him in the right direction on workflow. I offered to ask... Read more

Reports, Courses, Study Guides, Live Webinars

For Peer Network members and customers with BuildingGreen Premium or LEEDuser Premium membership.

Learn more about our Peer Networks Membership »

Learn more about BuildingGreen Premium Membership »

Learn more about LEEDuser Premium Membership »

"Already a premium or peer network member? Login in... Read more

Forum topic

Hi All,

My team member is leaving Webcor, and unfortunately that means we have to fill her big shoes with someone new! I thought I'd reachout here and see if you know anyone of high caliber looking for a Sustainability Manager position? Someone with LEED PM experience preferred, and a bit more technical background with MEP/ZNE ideally... Read more

Forum topic

Hi everyone,

We're pitching a green wall to a client for a project in NYC and are looking for recommendations on systems/companies.  We've done them locally, but the company we've worked with only services the Boston area.  There are so many companies out there now that we'd rather go with one that's recommended.  Thanks in advance for... Read more

Forum topic

Hey group,

I'm part of the contractor team on a large commercial project pursuing LBC v3.1 Petal Certification, with one of those petals being materials. This requires the team to meet Imperative 10 Red List.

The ownership group has taken the responsibility of red list vetting as a task of their own. The construction team is to... Read more

Forum topic

Hello, fellow SDLs, 

I wanted to share an opportunity for you - or those in your network - to join a passionate team of architects and designers based in Anchorage, Alaska. I'm told that you'd be asked to join the full team in Anchorage a few times a year for team building events but otherwise you can WFW (work from wherever!).

I... Read more

Forum topic

Under a high carbon scenario, most of North America will be 2 degrees C hotter by 2050. Meantime, we're designing buildings that will still be around in 2050, to codes that don't yet factor in chronic risks associated with climate change. I want to explain these risks to my colleagues; I'm hoping some of our green gurus can help answer the... Read more