×

Error message

  • The specified file temporary://fileVGllMv could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://fileSOWFbT could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://fileZ6RobC could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://fileXk1nbC could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://fileEaBlcX could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
BuildingGreen Report

Team Group

Forum topic

Greetings Gurus, following the AIA COTE Design for Economy concept, does anyone have a resource for a list of building efficiency ratio "targets" by space type? I've always struggled with this initiative. 

Forum topic

Hi Gurus!

I'm desperately seeking any case studies (past/currently on the boards) of labs that have been designed without natural gas infrastructure (the topic I have to debate is about commercial spec labs but any lab case study, wet or dry, is welcomed). This is for a development authority that will be setting guidelines for new... Read more

Forum topic

Hey there hive mind,

Anyone have any CxAs in the Bay Area that they'd particularly recommend? I have a project in need.

Aley

Forum topic

Hi all,

We are about to start a affordable housing passive house project in Boston and in a few presentations I've seen great signs that builders use to try to get the point across to subs as to how important air sealing is. Some are even quite funny! The builder we are working with does not have a sign like this, but is open to ideas.... Read more

Forum topic

With the increasing need to support design with techncial expertise, I am curious to hear how others are meeting this challenge.  Do you build energy models in-house?  Do you have a team of experts whose sole responsibility is to support design teams with tasks such as energy modeling and LCA, or is that expertise distributed throughout the... Read more

Forum topic

Apologize in advance if this has been posted before but we are trying to get manufacturers of stage curtains to give documentation that proves that the product does not have halogenated fire retardants. Manufacturers say they don't have them or concentrations are limited to 100ppm but they don't seem to have documentation to provide for it.... Read more

Forum topic

I opened IE11 (Internet Explorer 11) today, and saw a message indicating IE11 will be retired June 15th, 2022. While I have no personal attachment to IE11, it was the only internet browser I could consistantly get to open LEED Online credit templates on the actual website. 

Has anyone found another way to be able to fill out LEED credit... Read more

Forum topic

I'm hoping someone knows the anser to this question. For the LEED ND certification the minimum requirement is "The LEED project should contain at least two habitable buildings and be no larger than 1500 acres." Does habitable mean buildings with dwelling units?

Forum topic

I just saw this post from Conor on LinkedIn.

Starting in January 2019, all new Columbia Construction Company projects require LED temp lighting.

Are others doing this too? Frankly, given all the benefits and how quickly the industry is matured, it's hard for me to understand why anyone would use anything other than LEDs on a job.... Read more

Quiz

Welcome to the quiz portion of Wood: What’s Good?

Learning Objectives
Upon completing this course, participants will be able to:


Define “biogenic carbon” and explain its implications for life-cycle assessment of wood products. List the benefits and limitations of seven types of structural wood products.  Understand how... Read more

Reports, Courses, Study Guides, Live Webinars

THIS WEBINAR PURCHASE AND REGISTRATION IS CLOSED.

Buildings aren’t garbage. But you wouldn’t know it by examining the way the AEC industry works. 

We typically design buildings for a single, limited purpose. We build them partly out of plastics that can’t be readily recycled. We choose diverse materials... Read more

Forum topic

Hello Green Gurus,

We’re happy to see the first round of summit registrations rolling in! We’ve had lots of questions about specific topics for the sessions. As usual, the agenda will be based on topics that are top of mind for you.

Whether you are already registered or not, please fill out the Pre Summit-Palooza Survey to help us... Read more

Campus-wide Group

Quiz

Welcome to the quiz portion of Stone, The Original Green Building Material.

Learning Objectives
Upon completing this course, participants will be able to:


 

1. Explain how stone is natural and durable, emits no VOCs, requires almost no maintenance, and provides a connection to the earth and our history.
2.... Read more

Forum topic

Hi Everyone,

HKS is looking for an energy analyst & systems design engineer for our Dallas office. If you know anyone that might be interested and qualified for this position, please send them our way!

https://careers-hksinc.icims.com/jobs/2428/energy-analyst-%26-systems-design-engineer/job

Thanks,

Ellen... Read more

Forum topic

Hello, what acceptable levels of air quality are you using to evaluate natural ventilation strategies for your projects?  In our Living Building we only open windows when PM10, PM2.5, etc. are within LBC and WELL limits.  In a seasonally smoggy urban environment, this limits how often we can utilize natural ventilation even if the outside... Read more

Product Guide

CEUs are available for reading all the building-envelope product guides and primer. Click here to learn more and take the quiz.

Stick-framed walls are labor intensive and have to be sealed and insulated in the field, where conditions are not ideal; this can lead to poor thermal performance.

BuildingGreen-Approved Structural... Read more