×

Error message

  • The specified file temporary://fileQwqxvK could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://filebvdcNG could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://fileynYK5y could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://fileam3rYW could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://fileXFZyUk could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
BuildingGreen Report

Basic page

Peer Networks Application for Peer Network Membership Sustainable Community Design Leaders

The Sustainable Community Design Leaders Peer Network brings together planners, architects, landscape architects, and allied leaders who are committed to leveraging the... Read more

Quiz

Welcome to the quiz portion of Integrated Design Meets the Real World.

Learning Objectives
Upon completing this course, participants will be able to:


 

1. Define the integrated design process and describe what makes it different from the conventional design process.
2. Describe the charrette process and list... Read more

Forum topic

As we begin to look into Scope 3 emissions reduction strategies, it's important to understand ways to reduce tranportation emissions to project sites. Is anyone aware of best practices or programs for contractor carpooling to jobsites? I know many of my colleagues travel to work together in one vehicle because of parking limitations, however,... Read more

Team Group

Forum topic

test

Forum topic

For those of you working in jurisdictions with both prescriptive and performance-based commercial energy code pathways, roughly what percentage of your projects are using the performance pathway? How do your project teams decide which pathway to follow?

In Minnesota we are seeing very few projects pursuing the performance pathway,... Read more

Forum topic

Hi gang,

Following up on the recent Air Quality Design Jam at the summit, I’d like to round up the folks interested in supporting an Air Quality Working Group.

Didn’t attend the summit? No worries – everyone is welcome! We had a good group the other week and several of us want to continue the conversation.

The design jam... Read more

Forum topic

I took a first pass at content for the Energy Audit best practice, see the uploaded file. 

Forum topic

see IFTF- A New Story to Spark the Future of Climate Action

and chek out their Climate Action Map download

Forum topic

I just saw this post from Conor on LinkedIn.

Starting in January 2019, all new Columbia Construction Company projects require LED temp lighting.

Are others doing this too? Frankly, given all the benefits and how quickly the industry is matured, it's hard for me to understand why anyone would use anything other than LEDs on a job.... Read more

Forum topic

Hello All,

A group of us (three architects and a builder- sounds like there should be a joke here) were debating this and we  are stumped.

Application: Residential exterior trim.

50 year warrantied composite product of agricultural byproduct with PVC (EPD not published yet) vs 100 year (if primed on all sides and painted or... Read more

Forum topic

Hi All,

The National Architectural Accrediting Board is currently undergoing review and revision of its “Conditions for Accreditation and Procedures for Accreditation.”

I recently attended the 2019 Reynolds Symposium: Education by Design, hosted by the University of Oregon in Portland. At the Symposium, a group of 100... Read more

Author

Pat U. Mellona

Forum topic

Columbia already offers access to free EV charging for our field employees. Of the few projects that have have opted in so far, we've had to custom design and intall EV charging setups. It's good that we're doing this, but it won't scale quickly enough and cost effectively.  I think a practical next step is working with trailer companies so... Read more

Quiz

Welcome to the quiz portion of Building as an Organism: Understanding the Integrative Process Credit in LEED v4 Projects (recorded webcast)

Learning Objectives
Upon completing this course, participants will be able to:


1. Explain why integrative design is the key to cost-effective, high performance green buildings and LEED... Read more

Campus-wide Group

Forum topic

I'm hoping someone knows the anser to this question. For the LEED ND certification the minimum requirement is "The LEED project should contain at least two habitable buildings and be no larger than 1500 acres." Does habitable mean buildings with dwelling units?

Quiz

We think fresh water supplies are endless, but this idealistic vision is clouded by the smoke of countless forest fires in the U.S. West and elsewhere. Instead of endless bounty, climate change is bringing us catastrophic droughts and flooding that now dominate the headlines and threaten entire regions.

This report covers innovative... Read more

Forum topic

Hi All,

I will be catching up on learning units over Thanksgiving weekend and I am wondering if anyone else is experiencing the challenge of credential maintenance of their CPHD? Ideally we would have a client go for Passive House accreditation on a project, but lacking that, how are folks maintaining their 20 credits per year? For... Read more