BuildingGreen Report

Forum topic

Hello Sustainability Leaders,

I am writing with some news from the Peer Networks team. 

I recently accepted a job with a local college I have long admired in their advancement office. Therefore, my last day at BuildingGreen will be Fri. Feb. 11th. 

Working with you all these past four and a half years has been such an... Read more

Forum topic

Hello friends,

Here’s another upcoming event that BuildingGreen has been hiding up our sleeve: a San Francisco Bay Area Mini-Summit! A summary is below, see the registration page for more details or to sign up. This event is intended for SF locals, so folks who work farther afield can join, with the knowledge that Bay Area-specific... Read more

Forum topic

Does anyone have a good recommendation for getting started with energy modeling with future weather files? We use a combination of Sefaira and Climate Studio, but open to suggestions. Even just links on how to approach this for making good recommendations to clients. Thanks in advance.

Forum topic

Hi all and Happy New Year: I'm writing  to make sure that you're aware of the USGBC's call for members for a new LEED Resilience Working Group.  See below.  The deadline is coming right up -  Please pass this along to others you may think of in the topic areas they identify below.

Thanks

Mary Ann

I wanted to let you know... Read more

Forum topic

Hi everyone - 

The State of Oregon just posted this Policy Analyst Job Posting. The position is specifically looking for someone to assist in embodied carbon and other sustainable code items. I have heard directly from Oregon's Building Code Division that even though the position is looking for public policy, an architect or engineer (or... Read more

Forum topic

testing

Product Guide

Engineered wood efficiently utilizes fast-growing, small-diameter trees.

When sourced from responsibly managed forests, engineered wood can store carbon that would otherwise enter the atmosphere, and can replace high-embodied-carbon concrete and steel in some structural applications.

Engineered wood products can also provide a... Read more

Forum topic

Looking for an example or case study for a building utilizing a radiant heating/cooling in climate zone 4a. General use type is office with some public assembly spaces, total of 85,000 sf.

As usual, everyone, especially mechanical engineer, is terrified by the thought of "condensation." So far, I read a DGWW case study, "Energy... Read more

Author

Campus-wide Group

Forum topic

Under a high carbon scenario, most of North America will be 2 degrees C hotter by 2050. Meantime, we're designing buildings that will still be around in 2050, to codes that don't yet factor in chronic risks associated with climate change. I want to explain these risks to my colleagues; I'm hoping some of our green gurus can help answer the... Read more

Forum topic

Hi All,

Elkus Manfredi Architects in Boston is looking to fill a few positions -if you know of anyone looking in the Boston area, plesae let me know or send them my way. Kfritsch@elkus-manfredi.com

Specifically looking for an entry-level person with specialized expertise in parametric modeling, conceptual energy modeling and... Read more

Campus-wide Group

Quiz

Welcome to the quiz portion of Finding Furniture Without Toxic Flame Retardants.

Learning Objectives
Upon completing this course, participants will be able to:


 

1. Explain why avoiding toxic flame retardants is important.
2. Explain how we were swindled into dosing our buildings and our bodies with flame... Read more

Forum topic

HI Green Gurus. Great news for those who signed the petition to WHO last summer, and even those who didn't. The World Health Organization’s (WHO) released on March 1, 2021 a Roadmap to improve and ensure good indoor ventilation in the context of COVID-19. This document provides practical advice on how to mitigate COVID-19 through airborne... Read more

Forum topic

Hey group,

I'm part of the contractor team on a large commercial project pursuing LBC v3.1 Petal Certification, with one of those petals being materials. This requires the team to meet Imperative 10 Red List.

The ownership group has taken the responsibility of red list vetting as a task of their own. The construction team is to... Read more