×

Error message

  • The specified file temporary://fileb36OZU could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://file8NVFr0 could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://fileIm9raP could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://filejXAk5R could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://fileUSpniw could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
BuildingGreen Report

Quiz

Welcome to the quiz portion of Exterior Paints: Long-Term Protection and Environmental Tradeoffs.

Learning Objectives
Upon completing this course, participants will be able to:


 

1. List the primary differences between alkyd and latex paints and stains and between wood, concrete, and metal primers.
2. Explain... Read more

Forum topic

Has anyone used a commercial heat pump water heater for a large protect?  I have found a few manufacturers for this technology, but want to make sure this is a viable and cost approach to electrical eliminate gas on a path to all electric.

Forum topic

Here is a fundamental question regarding measuring operational carbon emissions that I'm sure many of you can clarify for me:  Let's say you are considering design options and you want to know the relative contribution of GWP of adding an additional inch of continuous insulation to the building envelope.  The GWP from embodied carbon will... Read more

Author

Amanda is BuildingGreen's Peer Networks Manager, working behind the scenes to support the Peer Networks team and members. They are passionate about sustainable design and love helping people find tangible ways to help the planet.

Prior to joining BuildingGreen in 2023, Amanda was a campaigns coordinator at a food justice... Read more

Forum topic

Hi everyone - in doing a carbon footprint for our firm, does anyone know if buildings that we design as Architects considered scope 3 emissions, or are they beyond the boundary of emissions? LMN's buildings, despite best efforts, are cumulatively multiple orders of magnitude above our scope 1 and 2 emissions. We have never included these... Read more

Forum topic

Looking for an example or case study for a building utilizing a radiant heating/cooling in climate zone 4a. General use type is office with some public assembly spaces, total of 85,000 sf.

As usual, everyone, especially mechanical engineer, is terrified by the thought of "condensation." So far, I read a DGWW case study, "Energy... Read more

Forum topic

Hi all,

I'm curious if anyone has insight as to the "New Federal Building Performance Standards" that were announced in May of 2021 and then referenced again when E.O. 14057 came out. The memorandum for heads of agencies that was sent out with E.O. 14057 said that the CEQ would issue these standards, but I can't find a commitment to when... Read more

Forum topic

How interested are you in a Sustainable MEP Leaders Summit this summer? 

Please respond to this poll ASAP, as we need to gauge interest before we finalize any details.

When: Wed. July 26 at noon to Thurs. July 27 at 1:30. 
Where: At a conference facility near Boston
Cost: $1200, which includes lodging, meals, and... Read more

Forum topic

On LEEDuser we divide checklists into multiple project phases. Specifically:

Before the performance period Construction Construction documents Design development During the performance period Operations & maintenance Pre-design Schematic design

How many of these phases are relevant for BIT best practices?

Note that we also... Read more

Forum topic

Is LEED Online mind-numbingly slow today for anyone else? Or is it just me? I may give up and try again tomorrow. Frustrating as I was hoping to submit a final review today. :(

Forum topic

Hi all,

I'm curious how various firms are approaching their own office projects, re green building certifications. I'm especially interested in medium-large firms that have multiple offices, but policies and processes from small firms may still be instructive.

Do you have a firm-wide policy or is it a case-by-case thing? Has... Read more

Author

Peter Yost (at https://building-wright.com/ )  is available to provide building science expertise, trainings, public speaking, building investigations, and more. Learn more

Forum topic

Hello Sustainable Construction Leaders,

It's come to our attention that although we shared the slides from last fall's all-network Show & Tell in Atlanta, we neglected to include the presentations from the SCL Summit itself. Since we believe in "better late than never," here they are!

As a reminder: we have permission from... Read more

Forum topic

I'm working with a project team that is looking into bird control options to prevent nesting/roosting/pooping on the scrim that is designed to scrim their building's facade.  They are looking at electrified tape, repellents, laser systems, etc -- Options that don't dramatically impact the building design.  The products they're looking at claim... Read more

Campus-wide Group

Quiz

Welcome to the quiz portion of Essential Playbook to Managing LEED Construction.

Learning Objectives
Upon completing this course, participants will be able to:


1.  Understand the transition from LEED BD+C or ID+C v4 to LEED v4.1, especially in regard to material-related credits.

2. Discern how to properly... Read more

Forum topic

We have a client who is asking us to design a roughly 10 ksf Wellness Center for PHIUS 2021 certification.  The program includes several high density assembly type spaces - roughly 300 person peak occupant load for the building.  The Criteria Calculator that the architect showed us puts the building peak cooling load at 4 BTUH/sf (3000 sf/ton... Read more

Product Guide

CEUs are available for reading all the building-envelope product guides and primer. Click here to learn more and take the quiz.

Stick-framed walls are labor intensive and have to be sealed and insulated in the field, where conditions are not ideal; this can lead to poor thermal performance.

BuildingGreen-Approved Structural... Read more