BuildingGreen Report

Forum topic

Hello Green Gurus,

Here is the information for August's Peer Networks Webinar, A more Mindful Future: mindful MATERIALs plans for Digital Transformation through the Common Materials Framework. We hope you will join us!

Register HERE

A more Mindful Future: mindful MATERIALs plans for Digital Transformation through the Common... Read more

Campus-wide Group

Forum topic

Hi All:  We are in the design phase for a 5,700 SF project in NH. The team is taking care to drive down embodied carbon where possible. It will be NZE.

A1-A3 emissions are coming in at 67.15 kgCO2e/sf, of which 11.97 kgCO2e/sf is a hot spot attributed to permeable paving and concrete pavers (a little skewed, since lot and patio sizes... Read more

Forum topic

Hello everyone,

Here's a reminder that our call for this month will be taking place next Tuesday, November 12th at 2:00pm EST.

Please feel free to join us!

Join Zoom Meeting:

https://zoom.us/j/248664490

One tap mobile
+16699006833,,248664490# US (San Jose)
+19292056099,,248664490# US (New York)... Read more

Forum topic

A question for you, all input appreciated: What are some metrics and data points you all use to report out to your staff and leadership? I'm starting on higher-level analysis of our projects' performance by typology and through other lenses, and I wonder if you have found metrics or reporting points that are particularly impactful in your... Read more

Forum topic

Should the Best Practice names always be accompanied by their number? See the attached screenshots, all taken from the main forum page:

Best Practice labels next to individual forum posts Best Practice names in the forum filter dropdown Best Practices in the main navigation dropdown menu

Forum topic

Has anyone here performed circadian lighting studies for WELL using rhino/grasshopper (Lark Spectral Lighting)? 

It seems that Lark can only simulate circadian metrics for daylighting, and NOT electric lighting.  Can anyone shed some light on this?  pun intended :)

Are there any other tools out there that would enable us to... Read more

Quiz

Welcome to the quiz portion of Integrated Design Meets the Real World.

Learning Objectives
Upon completing this course, participants will be able to:


 

1. Define the integrated design process and describe what makes it different from the conventional design process.
2. Describe the charrette process and list... Read more

Forum topic

Beginning this year, Miller Hull will not only continue to quantify the upfront embodied carbon of every project we finish through construction, but now purchase third-party certified carbon offsets equivalent to one-third of the project’s impact. Great design is no longer enough - we must take responsibility for our architectural impact in the... Read more

Quiz

We think fresh water supplies are endless, but this idealistic vision is clouded by the smoke of countless forest fires in the U.S. West and elsewhere. Instead of endless bounty, climate change is bringing us catastrophic droughts and flooding that now dominate the headlines and threaten entire regions.

This report covers innovative... Read more

Forum topic

Hello Green Gurus,

Some of you may have heard that the Sustainable Construction Leaders Group has been developing the Contractor’s Commitment, a set of sustainability guidelines for contractors to implement in their companies. 

The Contractor’s Commitment will be going live on November 13th with this half-hour webinar introducing... Read more

Peer Network Event

Forum topic

There has been a lot of discussion re antimicrobials in this group, so here is a pre-release of this month's article on the topic. It's not an extensive feature, but I hope you find it informative.

Brent

Product Guide

Pint-flush and non-water urinals can save tens of thousands of gallons of potable water per year. A single non-water-using urinal can save more than 10,000 gallons of water per year compared with the U.S. EPA standard of 1.0 gallon per flush (gpf).

When older 3.0 gpf urinals are replaced, the savings can be as great as 50,000 gallons... Read more

Forum topic

Hello everyone. I am seeking some guidance on crafting an arguement for why my firm should support a change to the Washington State Energy Code which would mandate electric heat pumps for commercial builidngs.  AIA WA is working on the state commercial energy code update under consideration this spring.  We have been invited to sign on to an... Read more

Forum topic

Are your firms discussing the health effects of silica dust on people working with engineered stone and the recent announcement of the upcoming ban in Australia, as of July 2024?

https://www.dezeen.com/2023/12/14/australia-bans-engineered-stone-silico...

According to the article, a recent report says that there is no safe level of... Read more

Forum topic

HI All,

I am curious if others are using THERM in-house for your envelope design?

We usually use our building envelope/curtain wall consultants (Boston - so mostly RWDI and Heintjes) but our teams are finding that they need the information faster than our consultants can provide, they are backlogged, or we have some curtain wall... Read more

Forum topic

There are a number of SDL and other peer network folks talking about a potential casual meet up in association with Living Future 24 (next week in ATL).

In the interest of Julie McCoy-ing this thing into being ... 

Who: All y'all ... any Peer Network folks who are in town for LF24 (or local to ATL). 

Why: Connecting is... Read more

Forum topic

In an effort to share expert knowledge on the topic of whole building LCA, we are continuing our expert guest webinar series, addressing the topic of steel on March 19th at 1PM EDT. Michael Gryniuk PE, with LeMessurier and SE 2050, will be joining us to share his strategies for reducing the embodied carbon of steel. This webinar is particularly... Read more

Forum topic

Like everyone we’re struggling with the tight labor market. We’re not looking to poach. What we have found previously are individuals that have a passion for high-performance buildings but aren’t working on them in their current role for one reason or another.

Openings include:

Project Manager              3-5 years’ experience on... Read more