Quiz
Welcome to the quiz portion of The Great Eight: High-Impact Material Choices for Green Building.
Learning Objectives
Upon completing this course, participants will be able to:
1. Specify green building materials in product categories that truly make a difference for human health, the environment, or both.
2. Conduct a... Read more
Forum topic
On LEEDuser we divide checklists into multiple project phases. Specifically:
Before the performance period Construction Construction documents Design development During the performance period Operations & maintenance Pre-design Schematic designHow many of these phases are relevant for BIT best practices?
Note that we also... Read more
Forum topic
Has anyone used a commercial heat pump water heater for a large protect? I have found a few manufacturers for this technology, but want to make sure this is a viable and cost approach to electrical eliminate gas on a path to all electric.
Forum topic
Hi everyone - in doing a carbon footprint for our firm, does anyone know if buildings that we design as Architects considered scope 3 emissions, or are they beyond the boundary of emissions? LMN's buildings, despite best efforts, are cumulatively multiple orders of magnitude above our scope 1 and 2 emissions. We have never included these... Read more
Forum topic
Here is a fundamental question regarding measuring operational carbon emissions that I'm sure many of you can clarify for me: Let's say you are considering design options and you want to know the relative contribution of GWP of adding an additional inch of continuous insulation to the building envelope. The GWP from embodied carbon will... Read more
Forum topic
How interested are you in a Sustainable MEP Leaders Summit this summer?
Please respond to this poll ASAP, as we need to gauge interest before we finalize any details.
When: Wed. July 26 at noon to Thurs. July 27 at 1:30.
Where: At a conference facility near Boston
Cost: $1200, which includes lodging, meals, and... Read more
Forum topic
Is LEED Online mind-numbingly slow today for anyone else? Or is it just me? I may give up and try again tomorrow. Frustrating as I was hoping to submit a final review today. :(
Forum topic
Hi All,
How are folks funding training for your employees? Would it help to have free training opportunities besides lunch and learns or ones you do yourself?
For those of you outside of Massachusetts you may have employees or friends in MA that this could be relevant to. I'm hoping my friends in MA have already heard this.
... Read moreForum topic
Hi all,
We are looking to study Passive House on a couple small multifamily projects. Our understanding is that WUFI Passive only integrates with SketchUp at this time. Our BIM manager has been trying to find an example of a firm that works in Revit and uses WUFI Passive, to point him in the right direction on workflow. I offered to ask... Read more
Forum topic
Hello Sustainable Construction Leaders,
It's come to our attention that although we shared the slides from last fall's all-network Show & Tell in Atlanta, we neglected to include the presentations from the SCL Summit itself. Since we believe in "better late than never," here they are!
As a reminder: we have permission from... Read more
Forum topic
I'm working with a project team that is looking into bird control options to prevent nesting/roosting/pooping on the scrim that is designed to scrim their building's facade. They are looking at electrified tape, repellents, laser systems, etc -- Options that don't dramatically impact the building design. The products they're looking at claim... Read more
Forum topic
Friends,
Through AIA work I have been working with Kim Shinn from TLC Engineering. Kim is involved on the ASHRAE 209 development and has been advocating that the AIA, ASHRAE and USGBC align around this standard. Personally I think this is a good idea as I expect that this standard could easily make it's way into regulations and contracts... Read more
Forum topic
Hi all,
We have a project in New Orleans that needs to meet the GSA Inflation Reduction Act (IRA) requirements and submit EPDs. For our concrete, there is only one manufacturer that meets the requirements and is more than 50 miles away (according to EC3). Does anyone have tips on attempting to talk to local concrete manufacturers about... Read more
Product Guide
Board insulation has good thermal performance ranging from about R-4 to R-8 and is used as an integral part of a building envelope’s continuous insulation system.
Because board insulation is used on the building exterior, it is not always subject to the same material health and emissions requirements as batt insulation used inside the... Read more