BuildingGreen Report

Forum topic

Hi gurus,

Do any of you have preferred portable devices for indoor air quality monitoring? I know it's hard to find apples to apples, but ideally temperature, CO2, VOC, PM2.5, PM5 would be on the list. Mid-level accuracy - better than consumer, not as $ as IAQ professional level. Thanks!

Campus-wide Group

Forum topic

Does anyone have a draft copy of the ASHRAE 209P standard? It has not been finalized? See an overview of it here from IBPSA 2016 summer meeting.

The 209 committee plans to release it for a 3rd public review and hopes to finalize it in late winter or early spring. I'm just trying to track down one of the earlier verisons of the document... Read more

Forum topic

Hold the date. February 6, 1:00 pm Eastern.

You won't want to miss this conversation with Tim Ryder, the staff person from Senator Schumer’s office who helped lead the development of the IRA. Tim will share about the sausage-making that led to the mess of incentives we’re coming to know and… love(?) And he's interested in our ideas on... Read more

Forum topic

First, there was Energy Use reductions

Then there was embodied carbon

Soon it will be refrigerant use/leakage calculations

…and much more

As coordinators and leaders of project teams, what does this look like for the practicing architect and our collaborators?

I have no idea. BUT I’m guessing someone is... Read more

Forum topic

Hello Everyone,

Here is the information and invitation to complete the SCL Demographics Survey! If you have multiple company colleagues on this forum (you can check in the group list here click "Group members" tab), please coordinate to have only one of you submit survey responses.

If you would you like to gather your answers... Read more

Forum topic

Has anyone used a commercial heat pump water heater for a large protect?  I have found a few manufacturers for this technology, but want to make sure this is a viable and cost approach to electrical eliminate gas on a path to all electric.

Forum topic

Hi everyone - in doing a carbon footprint for our firm, does anyone know if buildings that we design as Architects considered scope 3 emissions, or are they beyond the boundary of emissions? LMN's buildings, despite best efforts, are cumulatively multiple orders of magnitude above our scope 1 and 2 emissions. We have never included these... Read more

Forum topic

A couple Minnesota cities are considering adding electrification to their sustainable building policy (required for new construction receiving City financial assistance). Concerned that the market isn't ready for a full-on mandate, they are considering a more moderate approach of requiring developers/design teams to conduct an electrification... Read more

Forum topic

Hi all,

I'm curious if anyone has insight as to the "New Federal Building Performance Standards" that were announced in May of 2021 and then referenced again when E.O. 14057 came out. The memorandum for heads of agencies that was sent out with E.O. 14057 said that the CEQ would issue these standards, but I can't find a commitment to when... Read more

Product Guide

Stone was one of humanity’s first building materials and continues to play an important role in today’s green building industry. There are many stones used in the building industry, but the most common ones used for exterior cladding are limestone, granite, marble, slate, and sandstone.

BuildingGreen-Approved Stone and Masonry Cladding... Read more

Quiz

Welcome to the quiz portion of The Hidden Science of High-Performance Building Assemblies.

Learning Objectives
Upon completing this course, participants will be able to:


 

1. Define hygrothermal pressure and explain what it requires of water, air, and thermal barriers in high-performance assemblies.
2. Explain... Read more

Forum topic

Hi all,

We are looking to study Passive House on a couple small multifamily projects. Our understanding is that WUFI Passive only integrates with SketchUp at this time. Our BIM manager has been trying to find an example of a firm that works in Revit and uses WUFI Passive, to point him in the right direction on workflow. I offered to ask... Read more

Forum topic

Checking in to see if any of you have had good job site success with plastic water bottle recycling. Due to the LBC recycling requirements, we have to source separate onsite, and we're trying to has a separate plastics bin. For the most part, water bottles is going to be on of our biggest contributors.

Forum topic

On LEEDuser we divide checklists into multiple project phases. Specifically:

Before the performance period Construction Construction documents Design development During the performance period Operations & maintenance Pre-design Schematic design

How many of these phases are relevant for BIT best practices?

Note that we also... Read more

Quiz

Welcome to the quiz portion of Whole-Building LCA Tools for LEED v4 and v4.1.

Learning Objectives
Upon completing this course, participants will be able to:


1.  Understand the basic goals of whole-building life-cycle assessment, including how it can improve environmental performance and contribute to credit achievement in... Read more

Forum topic

Is LEED Online mind-numbingly slow today for anyone else? Or is it just me? I may give up and try again tomorrow. Frustrating as I was hoping to submit a final review today. :(