×

Error message

  • The specified file temporary://fileRy7XtG could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://fileR20x0c could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://fileMq3i1a could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://fileu9IMOM could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://filepl1bUr could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
BuildingGreen Report

Campus-wide Group

Forum topic

Hello Sustainable Advising Leaders,

Here are the notes from the last Zoom call. We had a great turnout! Looking ahead, now that things are rolling along we’d like to get into the rhythm of a regularly scheduled monthly call. Since Tuesdays seem to work well for most people, I am proposing the 4th Tuesday of the month from 3-4pm ET. That... Read more

Forum topic

Hello everyone,

Here's a reminder that our next monthly call will be taking place next Tuesday, October 8th at 2:00pm EST.

Please feel free to join us!

Join Zoom Meeting - I double-checked this link and it is correct!

https://zoom.us/j/248664490

One tap mobile
+16699006833,,248664490# US (San Jose)... Read more

Peer Network Event

Product Guide

Composite windows come in two basic types: fiberglass, and wood/plastic composite.

BuildingGreen-Approved Windows

Fiberglass and other composite window lines have NFRC unit U-factors of 0.20 or lower. Higher U-factors are allowed for products that include significant recycled content.

Manufacturers also must demonstrate... Read more

Forum topic

Hello everyone. I am seeking some guidance on crafting an arguement for why my firm should support a change to the Washington State Energy Code which would mandate electric heat pumps for commercial builidngs.  AIA WA is working on the state commercial energy code update under consideration this spring.  We have been invited to sign on to an... Read more

Forum topic

Hi everyone, we had a great first all-network call with the SCL members who joined us last month! We’re looking forward to the next all-SCL call on January 8, 2024 at 1pm ET.

In the meantime, we’d love for you to fill out this survey to help us best tailor the all-SCL calls to the needs of the network. Please fill out the survey by... Read more

Forum topic

I am wanting to take the pulse of this group on behalf of a manufacturer who has asked us a similar question.

The company in question makes wood products and has had FSC CoC for over a decade. Recently, they are encountering issues with sourcing FSC for about 50% of the wood species they offer. There just aren't FSC sources available.... Read more

Forum topic

We are trying to figure out how we are going to meet the LEED Credit for Building Life Cycle Impact Reduction for the first time.

One approach we're trying out: We're taking the results of our Tally model and looking at potential reductions from low-carbon concrete. However, the problem I am encountering is that when I take some of our... Read more

Forum topic

I am forwarding this request from Kate Simonen from the Carbon Leadership Forum to support a grant application for this research. I don't know if the link will work in this format but if you have questions or want to sign you can contact me or Kate and I can send you the mail with the link my email is:  lstrain@siegelstrain.com     Thanks... Read more

Forum topic

All--

I haven't been part of this group in a while, but I'm excited to have rejoined recently. Some of you know that I joined HMC last year as Chief Impact Officer. I oversee design, sustainability, research, and communications for the firm, which has 300 people in 6 offices in California. We were founded in 1940 with a mission to serve... Read more

Forum topic

Hi folks,

We often hear from you with a suggestion of someone who would be great for the network, and a question about how to refer them. We've now made that easy, with three steps laid out in an Outreach Toolkit that's posted in the left margin of the Member Directory.

So, if you're thinking of someone to invite or come across... Read more

Forum topic

Hi all,

We are in the process of pursuing the Integrative Process for Health Promotion pilot credit on a project. Has anyone been through the process? What did you learn? How did it change/inform your design? Would you do it again?

Thanks!

Michelle

Quiz

Auto-quiz used for CEUs for attendees of the 2023 SDL Winter Summit.

Author

As Building Green’s Finance Manager, Ashleigh is responsible for the development and analysis of financial strategic plans, operational budgets, and the development and analysis of associated performance indicators.  Additionally, in her day-to-day she oversees all areas of finance including: payroll, accounts payable and receivables, project... Read more

Forum topic

Hello Peer Network members,

I have some bittersweet news: I’ve accepted another job and will be leaving BuildingGreen. I’m excited to be the new Community Outreach Manager at Brattleboro VT’s Retreat Farm and to support their mission of connecting people to the land and to each other. I’ve learned so much from being part of this... Read more

Quiz

Welcome to the quiz portion of How to Make Integrated Project Delivery Work for Your Project.

Learning Objectives
Upon completing this course, participants will be able to:


 

1. State three problems that Integrated Project Delivery (IPD) promises to solve.
2. Dispel four misconceptions about IPD that have... Read more

Basic page

The Post-Yost Experience

What better way to follow up the magic of a live presentation from Peter Yost than with 30 free days of BuildingGreen Premium?

Get a free 30 days of BuildingGreen Premium »
No credit card required Peter Yost, relaxing after a long week's work.