×

Error message

  • The specified file temporary://fileK4ssbc could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://fileTaic9v could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://filelC2g25 could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://fileTkW4oT could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://fileiKJ9cz could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
BuildingGreen Report

Firm-wide Group

Product Guide

Composite windows come in two basic types: fiberglass, and wood/plastic composite.

BuildingGreen-Approved Windows

Fiberglass and other composite window lines have NFRC unit U-factors of 0.20 or lower. Higher U-factors are allowed for products that include significant recycled content.

Manufacturers also must demonstrate... Read more

Forum topic

Imagine folks have seen this, but thought it was worth bringing up: this study which shows the great need to build new renewable infrastructure to support electrification.

I've been in a few discussions with folks where we've discussed how electrification is objectively a good goal, but are we passing carbon from one source to another?... Read more

Forum topic

I am wanting to take the pulse of this group on behalf of a manufacturer who has asked us a similar question.

The company in question makes wood products and has had FSC CoC for over a decade. Recently, they are encountering issues with sourcing FSC for about 50% of the wood species they offer. There just aren't FSC sources available.... Read more

Campus-wide Group

Forum topic

Five types of green buildings explained. Check out this great infographic by the Pembina Institute: What do net-zero and zero-carbon buildings mean for energy use and climate pollution?

Author

Pat U. Mellona

Forum topic

Like everyone we’re struggling with the tight labor market. We’re not looking to poach. What we have found previously are individuals that have a passion for high-performance buildings but aren’t working on them in their current role for one reason or another.

Openings include:

Project Manager              3-5 years’ experience on... Read more

Quiz

Welcome to the quiz portion of "The Potential of Prefab: How Modular Construction Can Be Green"!

Learning Objectives
Upon completing this course, participants will be able to:


Define modular construction, including “volumetric” and “non-volumetric” modular building systems. Identify 13 advantages modular construction has for... Read more

Forum topic

SAVE THE DATE: ALL Peer Networks Show & Tell
Tuesday, November 19 | 8pm - 10pm
The Kendeda Building, Georgia Tech | Atlanta, GA

Start your time at Greenbuild on a high note!

Join your Peer Networks Colleagues from SDL, SCL, MEP, SDLS, and SAL for a high energy evening full of lightning round previews of the best... Read more

Forum topic

Hi friends! Despite thinking I had joined this forum on Day 1 - I hadn't! Just a quick hello and great to join you all. For anyone I don't yet know - my key focus through Sustainable Performance Institute is in helping companies institutionalize sustainability in their culture, systems and processes and helping them embark on a path of... Read more

Forum topic

All--

I haven't been part of this group in a while, but I'm excited to have rejoined recently. Some of you know that I joined HMC last year as Chief Impact Officer. I oversee design, sustainability, research, and communications for the firm, which has 300 people in 6 offices in California. We were founded in 1940 with a mission to serve... Read more

Forum topic

What a great first day!

Here are the slides from the show and tell presentations last night at SOM's office; everyone who presented with slides has given approval to share them.

Forum topic

Hi folks,

We often hear from you with a suggestion of someone who would be great for the network, and a question about how to refer them. We've now made that easy, with three steps laid out in an Outreach Toolkit that's posted in the left margin of the Member Directory.

So, if you're thinking of someone to invite or come across... Read more

Forum topic

If your HVAC designers are addicted to the crack that is Trace 700, and knowing that Trane is giving up on that product in the coming year, what loads program are you weaning* them onto?

Asking for a friend:  Have any of you had success in using the Revit plug-in for loads?

*When told that they should use IESVE for loads, our HVAC... Read more

Quiz

Welcome to the quiz portion of Video: Making the Green Insulation Choice for Your Project.

Learning Objectives
Upon completing this course, participants will be able to:


 

1. Discuss how insulation works.
2. Explain why certain materials make more sense than others in particular applications.
3. Summarize... Read more

Forum topic

I was asked to share this with my network...

"For colleagues working with LCA data, during design, construction, or facility management proces, please help us understand how EPDs are useful in your processes by completing the survey below:"

https://www.linkedin.com/posts/ashrant-aryal-2354497a_qualtrics-survey-q...

Product Guide

CEUs are available for reading all the building-envelope product guides and primer. Click here to learn more and take the quiz.

Wall assemblies are made up of a number of different materials and systems, and installing each of them requires considerable time and labor and can introduce errors that compromise the building’s weather... Read more