BuildingGreen Report

Forum topic

Columbia already offers access to free EV charging for our field employees. Of the few projects that have have opted in so far, we've had to custom design and intall EV charging setups. It's good that we're doing this, but it won't scale quickly enough and cost effectively.  I think a practical next step is working with trailer companies so... Read more

Basic page

w

Forum topic

Green Gurus,

We'd love your feedback.

The MEP group is endeavoring to make progress on integrative design. It has been long accepted that integrative design is necessary to make real progress, but a lack of stellar results demonstrates that it is easier said than done.

What is your experience with successes and failures... Read more

Forum topic

For those of you working in jurisdictions with both prescriptive and performance-based commercial energy code pathways, roughly what percentage of your projects are using the performance pathway? How do your project teams decide which pathway to follow?

In Minnesota we are seeing very few projects pursuing the performance pathway,... Read more

Forum topic

I am brushing up on current tools for local government greenhouse gas inventories and was wondering if any of you have used the EPA's Local Government Greenhouse Gas Inventory tool? Download the Local Greenhouse Gas Inventory Tool | US EPA 

Some of my immediate questions include: 

Is the EPA tool straightforward to use?

Are... Read more

Forum topic

Hello Green Gurus!

Quick introduction as this is my first time posting - Louis Koehl, AIA, CPHD, Director of Sustainable Design at Handel Architects, based in NY. I recently joined the SDL Forum and met some of you at the regional summit and Greenbuild.  I'm excited to continue to connect with such an influential group! 

My... Read more

Forum topic

I just saw this post from Conor on LinkedIn.

Starting in January 2019, all new Columbia Construction Company projects require LED temp lighting.

Are others doing this too? Frankly, given all the benefits and how quickly the industry is matured, it's hard for me to understand why anyone would use anything other than LEDs on a job.... Read more

Product Guide

CEUs are available for reading our entire plumbing guide. Click here to learn more and take the quiz.

Rainwater capture is increasingly important as shortages put pressure on our water systems.

BuildingGreen-Approved Rainwater Harvesting

We approve a wide range of rainwater catchment and storage systems and components, with... Read more

Forum topic

Apologize in advance if this has been posted before but we are trying to get manufacturers of stage curtains to give documentation that proves that the product does not have halogenated fire retardants. Manufacturers say they don't have them or concentrations are limited to 100ppm but they don't seem to have documentation to provide for it.... Read more

Forum topic

Hello,

We're trying to budget Fitwel Certification consulting fees for a non-profit client for whom we're designing an early childcare center in Louisville, KY. It would be for a single tenant new building Fitwel certification and include a Fitwel introduction workshop, working with design team, and coordinating/submitting documentation... Read more

Forum topic

Hi Green Gurus (esp. Sustainable MEP leaders...)

I'm looking for suggestions of contacts for MEP consultants, especially in the Chicagoland region, ideally with sustainability highly integrated into the work, specialization in geothermal systems, and indoor agriculture. (doesn't necessarily have to be all-in-one)

For context, we... Read more

Quiz

Welcome to the quiz portion of Video: Insights to Success on LEED-CI Certification.

Learning Objectives
Upon completing this course, participants will be able to:


 

1. Identify key changes to LEED CI 2009 (ID+C).
2. Identify the circumstances of a LEED-CI project that challenge the abilityto certify.
3.... Read more

Forum topic

BITuser Meeting:  5/23/18

Participants:  Shane, Andrea, Angela

Notes:

Southface to provide "style tiles" before 6/15 
Greg to send to Andrea, couple dozen images for Best Practice pages
Southface will send, in week to 10 days, "full content" for BP03 - Energy Audit 
(BP03 "full content" will address... Read more

Author

Jerelyn Wilson’s work with BuildingGreen started in 1985 as an owner and member of the Board of Directors. Since then, her evolving roles have included HR Director, Outreach Director, and currently CEO. She is responsible for working with mid-sized to large architecture firms to implement sustainability education, as well as professional... Read more

Forum topic

With the increasing need to support design with techncial expertise, I am curious to hear how others are meeting this challenge.  Do you build energy models in-house?  Do you have a team of experts whose sole responsibility is to support design teams with tasks such as energy modeling and LCA, or is that expertise distributed throughout the... Read more

Author

Forum topic

Hive mind,

We recently learned that 3M has discontinued the production of their 3M Daylight Redirecting Film (https://www.3m.com/3M/en_US/building-window-solutions-us/solutions/dayli...). This product was selected by an architecture client last year as the optimal daylight/glare control strategy for a school project, and we're assisting... Read more

Peer Network Event

Forum topic

Hi All- I will be starting bi-weekly mtg for the PFAS working group to align on our goals as consicous firms and finalize our message aka 'letter to manufacturers' for reducing PFAS in building materials. Please email me (pgupta-garg@wrnsstudio.com) to let me know if you are interested in being a part of the group. First mtg will be next week... Read more