BuildingGreen Report

Product Guide

Faucets with high flow rates waste water—not to mention the energy used to treat and deliver it to our buildings—and the additional water stresses our wastewater treatment systems.

Warnings Low-flow faucets may not be appropriate for every application. Where there are long pipe runs or large-diameter supply pipes, it can take longer for... Read more

Forum topic

Hi there SD Leaders,

We're running an LCA on one of our projects that's about to start construction that has had serious embodied carbon goals and I got a result that really surprised me. I haven't been able to find any obvious/glaring issues with the work, but these results are strange enough that I'm not feeling confident. I'm hoping... Read more

Forum topic

Hi Green Gurus,

We're off to a great start with First Friday Fikas* this year. We've had good turnout and lots of fun. This new tradition continues this Friday at 11:00 am Eastern Time (8:00 am Pacific). We have more fun planned, with prompts to help us get to know each other.

If you registered previously you can use that same... Read more

Campus-wide Group

Quiz

The construction sector’s take-make-waste approach to materials needs an overhaul. Materials and construction account for an estimated 11% of global greenhouse gas emissions annually. At the other end of the life cycle, demolition in the United States annually generates 90% of some 600 million tons of construction-sector debris. Getting trashed... Read more

Forum topic

Hi Everyone - I hope this isn't a repeat topic. We are starting to get familiar with TallyCAT at SAR+ and have a few people testing our projects in it. Is anyone willing to help us troubleshoot or share lessons learned? We're running into a few errors and wonder if our Revit models and workflow are the issue, or if we need to be doing something... Read more

Forum topic

I've been seeing Armstrong's DC flexzone ceiling system at Greenbuild for many years. I'm working on a net zero project with LED lights and solar panels. In theory, the transmission losses in going from DC power from panels to AC for the building to DC for the lights would be eliminated. But does anyone actually have experience using this... Read more

Forum topic

So every year about this time I get to spend many lovely moments with our AIA 2030 Reporting data. In order to make the data useful the CBECS baselines/National baselines aren't great in telling us how we did.

For about half our 15 projects that we report in the average year - performing arts, convention, data science schools, etc - a... Read more

Forum topic

I'm definitely slow on the draw here, but happy to be congratulating you, Allen! What a great recognition of your work as a firm! And I love that the story about it highlights the firm's diversity.

Also worth noting--just 'cause no one here has said it yet--how cool it is that Ed Mazria won the Gold Medal this, and that AIA updated it's... Read more

Forum topic

Anyone know of tools/methodologies for estimating embodied carbon and carbon sequestration potential of individual green infrastructure projects (e.g. bioswale along bikeway)? I've seen tools for the larger scale (e.g. land use change) as well as specific to trees (e.g. i-Tree), but these don't fully meet my needs.

Thanks!

Campus-wide Group

Forum topic

Hi, and welcome to the Sustainable MEP Leaders Peer Network! 

This online forum is one of the ways we can stay connected and support each other as we collaborate to help MEP design achieve its highest potential as an element of sustainable and regenerative buildings. Please introduce yourself with a little about where you work, what you'... Read more

Forum topic

Hello all,

We are looking at ways we can use our specs to reduce toxicity in projects and one step towards that goal may be to require RoHS compliant lighting, switches, alarms, meters, etc., as required by the Small Electrical Components exception in the Living Building Challenge. Based on LBC projects I have been involved with, it... Read more

Forum topic

Hey all,

We have a NAVFAC project going into construction that has indicated that they'd like to hire someone to help them with the construction tracking aspects of the UFC requirements, including the Guiding Principles Assessment (GPA) program through GBCI. We're on the design side, so cannot offer these services on our own project;... Read more

Quiz

Welcome to the quiz portion of Video: Eight Steps to Success with LEED-EBOM.

Learning Objectives
Upon completing this course, participants will be able to:


 

1. Describe the first steps project teams should take when considering LEED-Existing Buildings: O+M.
2. Understand the steps and timeline ofthe LEED-... Read more

Author

P.J. is an accomplished writer and speaker who brings passion, humor, and discernment to all her work.

Whether it’s a spotlight report on decarbonization, a webinar on ESG, or just a chummy email bulletin, she is ferociously committed to truth, accuracy, and thoroughly... Read more

Author

Shamus Gumshoe