BuildingGreen Report

Working Group

Product Guide

Typically made from petrochemicals, carpet and its adhesives can offgas. It is also a challenge to recycle them, increasing the chances that it will be incinerated or disposed of in a landfill. Because carpet has a limited lifespan, its life-cycle performance is key.

BuildingGreen recommends modular carpet that demonstrates lower life-... Read more

Peer Network Event

Team Group

Product Guide

Exterior shade or screening devices are generally much more effective at reducing solar heat gain than their interior counterparts.

BuildingGreen-Approved Shading

BuildingGreen approves exterior window and glazing attachments that reduce solar heat gain and glare or redirect daylight, providing important energy benefits while... Read more

Forum topic

Hi Gurus,

It seems odd to think about leases now, during a time when most business are giving up leases or reducing their footprints, but there are still leases going on! Please share this link to any clients of yours who might be interested and sign up yourself if you want to advocate to your clients to consider these leases!

... Read more

Forum topic

Looking for an example or case study for a building utilizing a radiant heating/cooling in climate zone 4a. General use type is office with some public assembly spaces, total of 85,000 sf.

As usual, everyone, especially mechanical engineer, is terrified by the thought of "condensation." So far, I read a DGWW case study, "Energy... Read more

Forum topic

Hello all, 

Any Fitwel experts out there? I have a 30,000 sf boutique hotel + spa client who would like to certify under the Fitwel rating system but Fitwel folks are telling me that no scorecard is currently available to hotel clients (can't use mulit-tenant or resi, that a hotel scorecard is under development). Has anyone used Fitwel... Read more

Author

Shamus Gumshoe

Campus-wide Group

Forum topic

On LEEDuser we divide checklists into multiple project phases. Specifically:

Before the performance period Construction Construction documents Design development During the performance period Operations & maintenance Pre-design Schematic design

How many of these phases are relevant for BIT best practices?

Note that we also... Read more

Forum topic

Hello all, 

Wondering if anyone has experience with lead limits in electrical cable and wiring? 

LEED for Healthcare allows a limit of 300 ppm of lead in electrical wire and cabling - my search for compliant products has been all dead ends. (MRc PBT Source Reduction - lead, cadmium, and copper)

Acceptable regulations for... Read more

Quiz

Welcome to the quiz portion of Net-Zero Water and More: Moving Beyond “Low Flow”

Learning Objectives
Upon completing this course, participants will be able to:


 

1. Define net-zero water.
2. Describe the role of utilities in water efficiency solutions.
3. Explain the water-energy nexus and the water-... Read more

Forum topic

Hello Green Gurus,

A close colleague of ours, Frances Yang of Arup, is distributing a survey developed in partnership with the Healthy Building Network (HBN).

The survey asks for which product categories you need more health information. Answers will help inform which product categories HBN next incorporates into its HomeFree and... Read more

Reports, Courses, Study Guides, Live Webinars

The BuildingGreen & GreenStep exam prep materials have been updated to the latest version based on the actual v2 exam. The new study guide site license is now available for your purchase and use in preparing to take the exam.  

The site license permits the purchaser to share the PDF Study-Guide file within their company/organization and... Read more

Forum topic

How interested are you in a Sustainable MEP Leaders Summit this summer? 

Please respond to this poll ASAP, as we need to gauge interest before we finalize any details.

When: Wed. July 26 at noon to Thurs. July 27 at 1:30. 
Where: At a conference facility near Boston
Cost: $1200, which includes lodging, meals, and... Read more

Forum topic

I'm working with a project team that is looking into bird control options to prevent nesting/roosting/pooping on the scrim that is designed to scrim their building's facade.  They are looking at electrified tape, repellents, laser systems, etc -- Options that don't dramatically impact the building design.  The products they're looking at claim... Read more

Forum topic

Hi friends,

We recently tracked our water consumption on site during the structural demolition of some existing reinforced concrete buildings.  The new OSHA silica regulations required us to keep dust to virtually zero, so we had a bunch of mist cannons and water hoses pumping water around the clock.  We consumed ~855,000 gallons in a... Read more

Forum topic

Hello! Does anyone know of any general contractors who produce a CSR? Is anyone aware of any general contractors who have an ESG rating? If so, what company is being utilized (i.e. EcoVadis) to get the ESG rating?  

Forum topic

Hello everyone - 

I'm writing today to let you all know that as of this month, I am retiring from SERA, and that I'm going to be beginning a new journey as a consultant/volunteer!

I'm going to continue dedicating my time to policy and advocacy work (focused on decarbonizing the built environment) but now I'll be doing it as a free... Read more