Forum topic
HI All,
Really hoping to get some insight from all you wonderful people on how the Sustainability teams are set-up in your construction companies. As mentioned in my introduction post, I am the first ever Sustainability Engineer hired by my company.....until now all the work was handled by project teams. Which worked for them in the... Read more
Product Guide
Replacing windows is expensive and comes with high impacts, but simple films can improve performance.
BuildingGreen-Approved Films
BuildingGreen approves three types of window films:
surface-applied films that have earned NFRC ratings and have a minimum 10-year warranty seasonal flexible-film kits bird-safety filmsEnergy... Read more
Quiz
Welcome to the quiz portion of Occupant Engagement: Where Design Meets Performance.
Learning Objectives
Upon completing this course, participants will be able to:
1. Restate at least five methods being used to provide feedback to occupants so that they better understand how to interpret, and respond to, their... Read more
Forum topic
I am now embarking on the home page design, but before I get started I need input on what you'd like to have there. The style tiles/tidbits provided by Southface includes a home page mockup that's very similar to LEEDuser, which is fine with me, but I don't want to implement it and then find out you want something radically different.
I... Read more
Forum topic
HI All,
I am curious if others are using THERM in-house for your envelope design?
We usually use our building envelope/curtain wall consultants (Boston - so mostly RWDI and Heintjes) but our teams are finding that they need the information faster than our consultants can provide, they are backlogged, or we have some curtain wall... Read more
Forum topic
Like everyone we’re struggling with the tight labor market. We’re not looking to poach. What we have found previously are individuals that have a passion for high-performance buildings but aren’t working on them in their current role for one reason or another.
Openings include:
Project Manager 3-5 years’ experience on... Read more
Forum topic
We had so much fun at our Contractor coffee talk that I reached out to our MEP friends to see if they would set up something similar. And they have agreed to host a talk on Thursday December 2, at 1-2pm EST. They will talk about decarbonizing buildings, on a schedule that keeps us under the 1.5° C limit and will also address strategies for... Read more
Forum topic
Hello Green Gurus!
Thank you to all who joined the cross-networks adventure that was the Sustainability Leaders Week: 2021 Summit-Palooza, all of us at BuildingGreen were so glad to share that time and space with you all.
We have been receiving a few questions about next steps, here are a couple details we wanted to share with you... Read more
Forum topic
Hi Gurus,
We are having a hard time sourcing a baby changing table that is free of anticmicrobial coatings. KoalaKare, the predominate manufacturer, includes Microban in both their plastic and stainless steel product options. Does anyone have any experience with a durable, ADA compliant and readily available baby changing table free of... Read more
Forum topic
Hello everyone,
Here's a reminder that our call for this month will be taking place next Tuesday, November 12th at 2:00pm EST.
Please feel free to join us!
Join Zoom Meeting:
https://zoom.us/j/248664490
One tap mobile
+16699006833,,248664490# US (San Jose)
+19292056099,,248664490# US (New York)... Read more
Forum topic
All, today is the day I had committed to sending out the DRAFT request to equipment manufacturers of what is needed for full electrification. I apologize that I didn't have time or focus to get my thoughts together till now (I had intended to share this with Chris and others prior to sending to the full group, but just didn't get my thoughts... Read more
Forum topic
We have a project looking to use Radiant Floors to help with space heating. I don't have experience with this so I'm looking for any insights. Pros / Cons?
This project is a non-profit and is needing to reach LEED Silver minimum. This is in Washington State. Thank you for your help.
Forum topic
Does anyone know about temporary flushout equipment that could be used to augment a building's systems to get additional CFM of OA during construction? For our non-laboratory type projects the flushout period ends up being too long, especially in either humid summers or frigid winters (Pennsylvania).
Hoping that some of you on either... Read more