Forum topic
Hi all,
We have a newly constructed, core/shell project having some hot water issues in the core restrooms.
There is a 0.35 Toto lav installed throughout. The hot water heaters are adjacent on each floor, located in the janitor closets. We did the math, and there could be a gallon of water standing and cooling in the pipe between... Read more
Basic page
The BuildingGreen/GreenStep exam prep materials are... Read more
Forum topic
We have an MEP engineer that is calculating peak loads at about 6 times passive house levels on a large commercial building that is at or near passive house levels of insulation and air infiltration. We suspect one reason is that he is figuring a 50% efficiency level for the ERV. We are showing him ERV systems with 80-90% efficiency, but they... Read more