×

Error message

  • The specified file temporary://fileAE24FY could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://file74mOA7 could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://file229pYU could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://fileI57OLq could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://fileEu2PjR could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
BuildingGreen Report

Peer Network Event

Forum topic

Hi all,

I wanted to reach out to fellow MEP energy modeling teams to assess everyone's experience with the new PCI calculation methodology in 2016. It was a substantial change in how we show savings on projects. Big changes can often come with un-intended consequences. I'm all for pushing to higher efficiency - just want to make sure we... Read more

Forum topic

Something we seem to be seeing a lot in our market recently are projects split into multiple packages - footing / foundation, C&S, and then later a TI package of CD's... mostly in an effort to speed up permitting and construction schedules. (Oftentimes with a contractor on board for a design / build approach). 

My question to the... Read more

Private Group

Forum topic

Hi All:  We are in the design phase for a 5,700 SF project in NH. The team is taking care to drive down embodied carbon where possible. It will be NZE.

A1-A3 emissions are coming in at 67.15 kgCO2e/sf, of which 11.97 kgCO2e/sf is a hot spot attributed to permeable paving and concrete pavers (a little skewed, since lot and patio sizes... Read more

Forum topic

Show & Tell Break-out Session: Post Occupancy Evaluations and Occupant Behavior

Presentations: 

Preliminary findings from our first year of data collection. Measured results in WELL Stories about visiting our past clients and teaching them about their energy use habits.
 

Quiz

Welcome to the quiz portion of Green Building Product Certifications: Getting What You Need.

Learning Objectives
Upon completing this course, participants will be able to:


 

1. Differentiate between a standard and a certification.
2. Describe "greenwashing" and list at least two ways to spot it.
3.... Read more

Forum topic

Hi all,

I've tried a couple of different search terms for the forum but haven't been able to find any past conversations on electrochromic glazing yet (which makes me suspect I might be missing something...). We have a potential opportunity to use it in a vertical curtain wall application with a client that is very interested in the... Read more

Forum topic

Has anyone submited this credit in lieu of demand response before?  I'm attempting on multiple projects but not sure what to expect review wise or how much confidence to have in the ability to get more than 1 point for trying.

https://www.usgbc.org/credits/gridoptimal-152-v4?return=/credits/New%20C...

Firm-wide Group

Forum topic

Dear Gurus,

At Greenbuild this year I'll be discussing how statistics can lie (in the context of green building claims).  I'm collecting examples of this to prepare.  If any of you know of examples, please send them to me! 

Here are a few of the fun ways statistics might lie that I would be looking for: biased or too-small sample... Read more

Forum topic

I am looking for examples of adaptive reuse projects that have addressed current or future flooding by elevating floors from the existing condition.

Forum topic

All - 

We have corporate clients that are starting to request antimicrobials in response to Covid-19. I assume we are not the only ones seeing an increase in these requests. Knowing that the evidence supporting antimicrobials has limited to no efficacy, how are you approaching these conversations? We want to continue to advise based on... Read more

Quiz

Welcome to the quiz portion of Boost Happiness and Save Energy with Adaptive Thermal Comfort!

Learning Objectives
Upon completing this course, participants will be able to:


Define “adaptive thermal comfort” and explain how it can contribute to occupant health and satisfaction.

Compare the adaptive comfort model... Read more

Forum topic

Hello - Other than hiring an acoustic consultant, I am wondering what in-house tools you are using internally at the design stage for modelling acoustic performance? 

Thanks, Mona

Forum topic

Hey Team,

I'm in a Living Future session where a number of manufacturers are talking about the low uptake they're seeing in their take back programs. Contractor friends... What barriers (if any) are you running into in using take back programs? How might we as architects help increase utilization of these programs?

Aley

Author

Peer Network Event

Forum topic

For a number of years a colleague and I have been teaching a course about sustainability and water in architecture at the University of Pennsylvania's architectural school (PennDesign).  This year we're hoping to bring a few new opinions to the table for at the same time as we broaden the discussion.  Because the class will be virtual again... Read more

Forum topic

Dear all,

On a major renovation where the wall R-value/U-value needs to be brought up to energy code, specifically a mass wall situation, does anyone have insights on how the situation is best dealt with? On the project in question for me, the continuous insulation might have to be added to the inside surface of the mass wall and there... Read more