BuildingGreen Report

Forum topic

The 2018 ENR Green Building Survey is due March 16th.  I'm sure you all know the metric they use to evaluate your ranking is solely the revenue from projects pursuing a green building certification in the previous calendar year.  Personally, I think this totally bogus.  How "green" a contractor is may correlate with how much revenue they have... Read more

Author

Upman LaTole

Forum topic

Zero Tool has an expired certificate and isn't functioning. https://zerotool.org/zerotool/

I've emailed info@architecture2030.org but nothing yet. Anyone have any suggestions for contacting the administrators?

Thanks,

Tiffany Broyles Yost

GBBN

Forum topic

Does anyone know about temporary flushout equipment that could be used to augment a building's systems to get additional CFM of OA during construction?  For our non-laboratory type projects the flushout period ends up being too long, especially in either humid summers or frigid winters (Pennsylvania).

Hoping that some of you on either... Read more

Forum topic

We are trying to figure out how we are going to meet the LEED Credit for Building Life Cycle Impact Reduction for the first time.

One approach we're trying out: We're taking the results of our Tally model and looking at potential reductions from low-carbon concrete. However, the problem I am encountering is that when I take some of our... Read more

Forum topic

Hello everyone. I am seeking some guidance on crafting an arguement for why my firm should support a change to the Washington State Energy Code which would mandate electric heat pumps for commercial builidngs.  AIA WA is working on the state commercial energy code update under consideration this spring.  We have been invited to sign on to an... Read more

Forum topic

Like everyone we’re struggling with the tight labor market. We’re not looking to poach. What we have found previously are individuals that have a passion for high-performance buildings but aren’t working on them in their current role for one reason or another.

Openings include:

Project Manager              3-5 years’ experience on... Read more

Forum topic

Hi All -

I am looking for recommendations for a car charging station for a Catholic convent project we are working on. At this time, the client has requested either 2 charging stations or one station that can charge 2 vehicles. I've been researching chargers and am thinking that it does make sense to specify a commercial-grade charging... Read more

Forum topic

Hello everyone,

Here's a reminder that our call for this month will be taking place next Tuesday, November 12th at 2:00pm EST.

Please feel free to join us!

Join Zoom Meeting:

https://zoom.us/j/248664490

One tap mobile
+16699006833,,248664490# US (San Jose)
+19292056099,,248664490# US (New York)... Read more

Forum topic

Dear All,

I'm happy to announce the Call for Speakers for our next Gulf Coast Green conference, which will take place June 1, 2018 at Rice University in Houston.  The theme is Resilience: Beyond Recovery.  (Harvey, you know).  We absolutely love to have SDL members at Gulf Coast Green, and I know there are several of you who specialize... Read more

Forum topic

Mass Timber Construction: An Economic Study of Supply, Best Use, and Implementation in three North American regions

This series unveils a macroeconomic study of building with mass timber in three U.S. regions; the Upper Midwest, Rocky Mountain Colorado, and the Southeast. 

Three companies - SCB Architects, LeMessurier, and Turner... Read more

Forum topic

Hi folks,

We're currently scoping out a BuildingGreen report on how the global market for recycled/recyclable materials has changed over the years, and what that means for waste management practices in construction, and for the availability of recycled content materials. 

This ties into the goal from the SCL Summit about LEED... Read more

Forum topic

Hi folks,

We often hear from you with a suggestion of someone who would be great for the network, and a question about how to refer them. We've now made that easy, with three steps laid out in an Outreach Toolkit that's posted in the left margin of the Member Directory.

So, if you're thinking of someone to invite or come across... Read more

Team Group

Product Guide

BuildingGreen recommends low-emitting acoustic ceilings that do not contain formaldehyde resins or PVC coatings. Look for those that have C2C Silver or Gold certifications, are Declare Red List Free, and are third-party certified for low emissions using CDPH Standard Method. We also prefer wood ceiling products with FSC certification. The... Read more

Quiz

Welcome to the quiz portion of Waste Water, Want Water.

Learning Objectives
Upon completing this course, participants will be able to:


 

1. Help clients make sound, holistic decisions about wastewater that take into account site, municipal infrastructure, energy goals, occupant needs, and maintenance considerations.... Read more