×

Error message

  • The specified file temporary://fileh60MrJ could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://fileOfDZKc could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://fileDofCfC could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://filef0SpQC could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://file2reLid could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
BuildingGreen Report

Forum topic

Hi all,

Just a reminder that the last day to RSVP for the Living Future 2023 Peer Networks Meetup is tomrorow, April 26th! There are still some spaces left, with 34 people currently signed up. Please RSVP here if you'll be attending.

When: Wednesday May 3, 2023, 7:30-9pm ET

Where: SmithGroup, 1700 New York Avenue, NW, Suite... Read more

Forum topic

Hi folks,

I hope you've seen the plug to sign onto the letter that's generated a flurry of messages on Green Gurus--I also emailed it out directly to everyone. We've got lots of architects on board, and a handful of engineers, but I think we just have one contractor so far (Thanks Theresa!)--it would be really awesome to have more.

... Read more

Forum topic

Hi Green Gurus, 

I am happy to join this group, and would like to share a short introduction of myself. I’m Jais, and I am with FXCollaborative as a Sustainability Design Specialist working with Ilana Judah. I have been here little over a month and am enjoying it so much! 

I have studied architectural design focused on... Read more

Forum topic

I'm sure most (if not everyone) is aware that LEEDv5 is under public review until May 20, 2024. I know I need to make time to flip through it, review, and comment, but I'm having a heckuva time protecting the time in my calendar to do that. Anyone interested in joining me for a 60 - 90 minute meeting to do this together as an accountability... Read more

Campus-wide Group

Forum topic

Hi everyone!

My awesome colleague, Paula Melton, is doing a short talk for USGC about mass timber and wants to know if there are SCLers in the group that can share their experience. In particular: 

"I’m wondering particularly about how supply-chain and cost issues are affecting availability and decision-making, and what the onsite... Read more

Forum topic

Has anyone had experience working with Hyper Metro (http://hypermetro.co/)? If so, did you find this company to provide value especially in dense urban environments where on-site segregation poses challenges to manage multiple C&D material streams on site? Hyper Metro claims to be able to provide rebates and to pay us for our trash.

Forum topic

Show & Tell Breakout: share what’s working and what isn’t! Which tools are your favorites? Have you developed any innovative applications? Discovered new pitfalls?

Presentations:

Experiences with Sefaira Early Performance Modeling software. How I got the firm to subscribe, how it wasn't working, and how I have been working with... Read more

Forum topic

Has anyone heard about batu or cumaru as substitutes for ipe? I am looking for a durable deckling material, and would appreciate your recommendations for sustainable choices!

Forum topic

Hi folks!

Do you have examples or case studies of projects with compelling examples of circularity/salvaged material reuse? We’re looking to go beyond the examples we've seen of furniture reuse or creating art from salvaged material, and we’d like to collect some examples to get our client excited about the possibilities in a deep... Read more

Quiz

Welcome to the quiz portion of Video: Eight Steps to Success with LEED-EBOM.

Learning Objectives
Upon completing this course, participants will be able to:


 

1. Describe the first steps project teams should take when considering LEED-Existing Buildings: O+M.
2. Understand the steps and timeline ofthe LEED-... Read more

Forum topic

Hello small firm Sustainable Design Leaders!

We are cancelling our call next week that had been scheduled for 2/13 @ 1pm. That same day, Thursday, BuildingGreen is hosting an all Peer Networks WEBINAR. Please consider participating with the sustainability leaders from all peer networks: Design Leaders, Construction Leaders, MEP Leaders... Read more

Quiz

The construction sector’s take-make-waste approach to materials needs an overhaul. Materials and construction account for an estimated 11% of global greenhouse gas emissions annually. At the other end of the life cycle, demolition in the United States annually generates 90% of some 600 million tons of construction-sector debris. Getting trashed... Read more

Team Group

Forum topic

Team,

https://www.buildingservicesengineersdeclare.com/

See link above, a group of UK building services (MEP) engineers (like us) signed on above, committed to do life cycle carbon (including embodied MEP) in their work.

Are we behind?  Should we match them?  leap frog ahead of them?

Best,

Luke Leung

Firm-wide Group

Forum topic

Hey, everyone! Eleven months after our initial release, we have now released a totally updated version of our EPIC tool. It’s available at the same location as before (https://epic.ehdd.com) and reflects thousands of hours of work over the last year. From humble beginnings in Excel, EPIC now has about 2,000 users and dozens of logins each day—... Read more

Forum topic

Friends,

We put a lot of effort into air tightness design, detailing, and construction administration, often including 6-sided mockup and parital or whole-building blower-door testing.  For commercial buildings, these tests measure air leakage in cfm/sf at 1.57 psf (75pa).  

I came across this research paper several years ago, but... Read more