×

Error message

  • The specified file temporary://fileqi2lmb could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://filepujU3F could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://file9cO9ff could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://fileg9n41v could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://filexwuisq could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
BuildingGreen Report

Basic page

Peer networks that allow knowledge sharing and collaboration between sustainability professionals

The Sustainable Design Leaders network and Summit events started over 10 years ago, when a group of sustainable designers realized that the struggles they faced and the goals they strove toward were shared by many... Read more

Forum topic

I was wondering if any of you have experience with integrated PVs and/or solar glass. If so, can you could recommend manufactures for each? We are working on a multistory freestanding building in an urban site for a mid-Atlantic city. Because our site and roof area are limited we are looking to maximized the areas where we can generate power.... Read more

Product Guide

Rotary Uninterruptible Power Units

Power interruptions and brief changes in voltage can damage electrical equipment, compromise computer data, shut down manufacturing, and endanger hospital patients. In the case of power outages, generators usually take over, but about 98% of all interruptions last less than ten seconds, and there is a... Read more

Forum topic

Hi Everyone.  Hope you and your families are all healthy and safe.

We are starting to figure out how we are going to implement the Contractors Commitment at my company, and we're using the opportunity to simultaneously set corporate wide and jobsite metrics and goals for sustainability tracking.

Each year we issue a sustainability... Read more

Forum topic

Hello - 

I am looking for the recording and the PDF/ slides that were shared 3/6 for the project process share-out/ 5 min presentations. It was super inspiring and I would like to refresh my memory of some of what was shared. Thank you!


Alison Nash 
AIA, LEED AP ID+C, CPHC, WELL AP
Associate | Sustainability... Read more

Quiz

Welcome to the quiz portion of Doing Daylighting Right.

Learning Objectives
Upon completing this course, participants will be able to:


 

1. Explain occupants' needs and habits when it comes to daylighting.
2. Recognize at least three recent mistakes in daylighting design and their respective alternatives going... Read more

Forum topic

Can anyone point me to a (dream?) resource listing effective R-values of various wall assemblies?  We are trying to find a cost-effective R-40 wall assembly for a one and two story public middle school targeting net zero energy in Oregon.  Referencing Seonhee's "thermal bridging" thread in late April, I used Therm's native drawing feature, but... Read more

Forum topic

I'm sure if I hop in the way back machine I could look in the forums and find old threads on LEED GA and LEED AP study resources, but I also know that material comes in and out of date. Has anyone found a good, current solution for firmwide LEED study materials?

We used to have some GBES resources, but those are intended to be person-... Read more

Campus-wide Group

Forum topic

Good Morning,  I have so enjoyed reading everyone’s personal introductions.  I am happy to be a part of this group and look forward to working together to create transformation of an industry that is sometimes slow to move.  My name is Patty Lloyd and I am the Sustainability Manager at Leopardo Companies, a Chicagoland area General Contractor... Read more

Forum topic

Hi all,

The USGBC Pacific Region is launching a new award this year that recognizes projects that have aspires to promote health of occupants and surrounding communities.  In true USGBC style, this award has not been properly publicized, so they are still looking for submissions.  I believe the deadline will be extended to June 7.  I... Read more

Quiz

Welcome to the quiz portion of Finding Products for LEED v4 and v4.1!

Learning Objectives
Upon completing this course, participants will be able to:


Explain the connection between building products and the whole-building life-cycle assessment credit option in LEED BD+C v4 and v4.1, and understand how this connection can... Read more

Forum topic

hi all! I'm almost at the finish line with this year's 2030 reporting...whew. I'm running into an issue that I wanted to throw out to this group, regarding the zero tool and national average baselines. Hoping some of y'all who manage your firm's 2030 data, or are just more familiar with CBECS and related data, have some insight / experience to... Read more

Forum topic

Hi folks, 

AIA COTE National is looking for Techincal Reviewers for the 2025 awards. Interested, or know someone who might be?  Sign up here: https://form.jotform.com/231175886103153

Thanks!

Forum topic

Hi everyone, on our SDL Regional Leaders call today we touched on how different offices are engaging with the Youth Climate Strike on Sept 20, and I offered to share a few resources that we've developed:  

1) Here is our public-facing official statement/endorsement: https://www.vmdo.com/architecture-blog/vmdo-youth-climate-strike/?fbclid... Read more

Campus-wide Group