BuildingGreen Report

Forum topic

Friends of EPIC –

Hey, everyone. As some of you might have heard, we’ve been working for a while with Autodesk to get c.scale (the data model behind EPIC) built into Forma – Autodesk’s AI-powered planning tool. Forma is packaged within Autodesk’s AEC collection and most firms using Revit should already have access. This integration is... Read more

Forum topic

Hi SDL: today is the last day to cast your vote in the voting for Greenbuild by 5PM ET.  

please vote for the terrific program put together on PV23 "The Tools You Need to Design for Climate Emergency Action" with me, Betsy and Beth Heider that will bring together a collection of tools, including brand new ones from Saskia, using the Top... Read more

Author

Upman LaTole

Forum topic

Hi all, has anyone come across a comprehensive (and recent) study looking at how long buildings actually last (beyond Stewart Brand)? I know of plenty that look at the benefits of reuse, but none that look at existing building stock and how much has been reused vs. demolished. 

As we start looking at embodied carbon metrics, I can't help... Read more

Forum topic

As promised at the SDL Summer Summet: Hennepin County Energy & Environment's new Project Manager’s Guide to Material Reuse in Commercial Buildings, with specification language, guidance for procurement, and case studies of successful reuse projects around the country. This resource is meant to help owners, architects, and contractors... Read more

Team Group

Forum topic

Hi Everyone.  Hope you and your families are all healthy and safe.

We are starting to figure out how we are going to implement the Contractors Commitment at my company, and we're using the opportunity to simultaneously set corporate wide and jobsite metrics and goals for sustainability tracking.

Each year we issue a sustainability... Read more

Forum topic

I'm sure if I hop in the way back machine I could look in the forums and find old threads on LEED GA and LEED AP study resources, but I also know that material comes in and out of date. Has anyone found a good, current solution for firmwide LEED study materials?

We used to have some GBES resources, but those are intended to be person-... Read more

Product Guide

Pipe that delivers domestic water in North America is typically made from copper, chlorinated polyvinyl chloride (CPVC), cross-linked polyethylene (PEX), all of which present environmental challenges. Bimodal polyethylene  (PE-RT) and polypropylene (PP) are potential alternatives with lower climate and health impacts.
... Read more

Forum topic

Hello Everyone,

On September 9th a regional cross-network group gathered for the first in-person Peer Networks event since the beginning of the pandemic. All Peer Networks were represented at this Boston Region Mini-Summit! With this first one in the books, BuildingGreen is hopeful for paving the way to future regional events across the... Read more

Product Guide

Caseworks can be made from unsustainable wood and other materials, and with adhesives and finishes that offgas formaldehyde and other hazardous compounds.

BuildingGreen-Approved Casework

Approved caseworks are:

made from FSC-certified wood or rapidly renewable materials verified as low emitting using CDPH Standard Method or a... Read more

Quiz

Welcome to the quiz portion of Deep Dive into the Integrative Process with Marcus Sheffer (recorded webinar)

Learning Objectives
Upon completing this course, participants will be able to:


Define “integrative process,” understand its role in LEED BD+C v4 and v4.1, and leverage its power to promote advanced sustainability goals... Read more

Quiz

Welcome to the quiz portion of LEED vs. Green Globes: A Definitive Analysis

Note: If you are taking this quiz as a member of LEEDuser, please take the quiz here.

Learning Objectives
Upon completing this course, participants will be able to:


 

1. Highlight the most significant differences between LEED and Green... Read more

Forum topic

All,

The current version of the program manual includes ID numbers for the best practices, as shown below. I know we want to keep a quick reference number or ID, but though it would be worth asking if we want to use the below, reorder them in some way, or use a different kind of ID. Opinions?

Thanks,
Jenny

--------... Read more

Forum topic

Good morning, All,

Just a bit of news this morning.  My family and I are moving back out west!  I am continuing in my current role with EwingCole, but will be doing so from Portland, Oregon.  Although North Carolina has a been a wonderful place for us for the past 13 years, it is time to be close to family in the northwest and southwest... Read more

Quiz

Welcome to the quiz portion of Video: Eight Steps to Success with LEED-EBOM.

Learning Objectives
Upon completing this course, participants will be able to:


 

1. Describe the first steps project teams should take when considering LEED-Existing Buildings: O+M.
2. Understand the steps and timeline ofthe LEED-... Read more

Forum topic

Hi there SD Leaders,

We're running an LCA on one of our projects that's about to start construction that has had serious embodied carbon goals and I got a result that really surprised me. I haven't been able to find any obvious/glaring issues with the work, but these results are strange enough that I'm not feeling confident. I'm hoping... Read more

Forum topic

Tomorrow is my last day at FXCollaborative before I head back to school. It has been such a gift to engage with you all over the past 10 years. Please stay in touch - my contact information is ilanajudah@gmail.com. I am headed out to UBC next week to do a deep dive into resilience and adaptation in urban environments.

FXCollaborative... Read more