BuildingGreen Report

Forum topic

Hello all,

I need future weather files for a project. We are looking at three years, 2050, 2075, and 2095 using two climate change scenarios, low emissions, and high emissions. I have seen ARUP's Weathershift site that uses RCP 8.5 and RCP 4.5. Are we assuming that 2.6 is not achievable? I would have used this as a low emissions scenario... Read more

Forum topic

A couple Minnesota cities are considering adding electrification to their sustainable building policy (required for new construction receiving City financial assistance). Concerned that the market isn't ready for a full-on mandate, they are considering a more moderate approach of requiring developers/design teams to conduct an electrification... Read more

Forum topic

Hello! 

We have several projects that are either pending ILFI Zero Carbon certification or the owner is planning to purchase offsets to cover construction emissions. Thus far, I have not considered this in our corporate footprint reporting. However, we are including A5 emissions whenever feasible and multiplying that performance over the... Read more

Quiz

Welcome to the quiz portion of Essential Playbook to Managing LEED Construction.

Learning Objectives
Upon completing this course, participants will be able to:


1.  Understand the transition from LEED BD+C or ID+C v4 to LEED v4.1, especially in regard to material-related credits.

2. Discern how to properly... Read more

Forum topic

Hi All,
We have a date and time for the next SCL Carbon Working Group Meeting, "see" you there:

Topic: SCL Carbon Working Group Mtg #2
Time: Mar 31, 2020 09:00 AM Pacific Time (US and Canada)

Join Zoom Meeting
https://sellen.zoom.us/j/595221970

Meeting ID: 595 221 970

Dial in info:
        +1... Read more

Forum topic

We have a client who is asking us to design a roughly 10 ksf Wellness Center for PHIUS 2021 certification.  The program includes several high density assembly type spaces - roughly 300 person peak occupant load for the building.  The Criteria Calculator that the architect showed us puts the building peak cooling load at 4 BTUH/sf (3000 sf/ton... Read more

Reports, Courses, Study Guides, Live Webinars

This webinar occurred Thursday, December 15.

Attendance confirmation closed Friday, December 30.

 

Whether it’s the flooding in Pakistan, the devastation caused by Hurricane Ian in Florida, or the record-breaking wildfire season in Europe, climate change is in the news daily. Just as there’s an urgent need to reduce... Read more

Forum topic

Has anyone worked on a WELL project? I have heard that you can expect about 1.5 to twice the effort of LEED coordination but wasn't sure how accurate that was. Any suggestions for determining the possible time commitment of WELL coordination?

Thanks in advance!

Product Guide

Ventilation fans, kitchen range hoods, and laboratory fume hoods can use significant amounts of energy from both the fan motor and from venting heated/cooled air out of the building—air that then has to be replaced and conditioned by energy-intensive HVAC systems.

BuildingGreen-Approved Ventilation Fans

BuildingGreen ventilation... Read more

Forum topic

Hello fellow sustainable design leaders! I am about to kick off an intensive effort here at EHDD to refine our internal standards for materials. We will be considering both GWP as well as the health of materials (avoiding harmful chemicals). In addition to setting the standards, I will be working to develop a process to vet materials before... Read more

Quiz

Welcome to the quiz portion of VOCs: Still Here, Still Making Us Sick!

Important: This quiz covers all related articles within this topic. Scroll to the bottom of the article page to find links to all the articles covered by this quiz.

Learning Objectives
Upon completing this course, participants will be able to:


1.... Read more

Campus-wide Group

Forum topic

Hi all,

We have a project in New Orleans that needs to meet the GSA Inflation Reduction Act (IRA) requirements and submit EPDs. For our concrete, there is only one manufacturer that meets the requirements and is more than 50 miles away (according to EC3). Does anyone have tips on attempting to talk to local concrete manufacturers about... Read more

Forum topic

Hi: Is anyone individually or at a firm level offsetting their travel through Certified Emissions Reduction (CER) or Verified Emissions Reduction (VER) credits? I'm trying to research a valid approach to doing this and running into a few different options - some even with apps. I'd appreciate any wisdom from this great group.

Thanks.... Read more

Forum topic

Want to make sure those in Portland are aware of a couple of LF18 Ramp-Up Events happening on April 10th. 

Introduction to the Living Building Challenge (presented by Kathleen Smith)
https://living-future.org/events/introduction-to-the-living-building-challenge/

Incentivizing Living Buildings in Portland 
https://... Read more

Forum topic

We have an increasing number of projects, where the client is coming to us with "net zero" aspirations and plans, some of which don't fit the typical all-electric, grid-tied building that produces 100%+ of its annual energy use on-site.  There include examples like:

1) A (targetd) living building that maximizes on-site production, with... Read more

Forum topic

HGA is seeking a Sustainable Materials Specialist to join our team! 

The role involves working with project teams to educate, research, and support decision-making related to sustainable materials and, in connection with sustainability experts across the firm, developing resources and tools to elevate HGA’s materials baseline.

The... Read more