BuildingGreen Report

Forum topic

Hi all,

The Sustainable MEP Leaders are assembling an industry push to expand the availability of embodied carbon data for MEP equipment. Our first steps are to send a letter to industry announcing a call to action and future educational webinars on the topic, the current draft letter is attached. In a similar manner as the... Read more

Forum topic

Hi Sustainability Leaders,

(Note: this post was edited to correct Jen's affiliation and to add Rob Winstead.) Please join me and the BuildingGreen team in congratulating the Peer Network members of the USGBC 2023 Class of LEED Fellows!

Geoffrey Brock, IPS-Integrated Project Services, SCL

Heather DeGrella, Opsis... Read more

Forum topic

He just posted the following on the Building Performance Knowledge Community forum:

Does anyone have a recommendation for software that is easy to use and relatively inexpensive for doing energy performance analysis at the schematic design (or before) phase?  We are looking for a tool that gives good quantitative comparisons for... Read more

Forum topic

My company is looking for ways to introduce and train employees on jobsite recycling and composting. There is definitely a culture shift that needs to change in order for it to happen, but we are looking for any success stories to help us on our journey.

1) Has anyone been successful in setting up recycling/composting programs for... Read more

Forum topic

Many on this list teach or have strong contacts with university programs, so I'm hoping to leverage our network in service of something that may be of general benefit.

EDR has a Research Fellowship program where we host young talent for 3 or 12 months addressing new theme each year. The Fellow(s) get "academic freedom" and have no... Read more

Team Group

Forum topic

Hi Friends, 

I'm working on an SOP for construction waste management for LBC core and LBC materials petal projects and wanted to get your input on the comingled facility requirements. According to the guidelines, any waste that goes to a comingled facility must be a facility that has an average diversion rate of 80% or higher as a... Read more

Forum topic

Hi everyone, 

The winning date for our Waste Management call is 3/24/2020 from 12pm-1pm PST.

Here is a link to the Google hangouts meet as well as a call in number for those without gmail accounts:

meet.google.com/cae-gdxd-qpp

(‪US‬)‪+1 240-224-0800‬

PIN: ‪996 308#‬

I am working on putting together an... Read more

Forum topic

Does anyone know about temporary flushout equipment that could be used to augment a building's systems to get additional CFM of OA during construction?  For our non-laboratory type projects the flushout period ends up being too long, especially in either humid summers or frigid winters (Pennsylvania).

Hoping that some of you on either... Read more

Forum topic

Is everyone else having trouble with a dysfunctionally slow LEED-Online today (i.e., worse than the usual incredibly slow performance)?

Forum topic

I see Kjell Anderson, Mary Ann Lazarus and Daniel Overbey as the Green Gurus on this list - if i missed anybody apologies.

Congrats all around folks!

https://www.usgbc.org/articles/gbci-announces-2018-leed-fellows 

Forum topic

I'm exploring the use of phase change material for a project. Specifically, looking at the BioPCM/ENRG Blanket product. I see on their website that ZGF used it at University of Washington. I'd love to hear any feedback from folks who have used it, and more specifically how your energy model and MEP engineer accounted for it. Thanks!! https://... Read more

Forum topic

Dear all,

A mechanical engineer on a healthcare project we are working on has asked for help in dividing the ventilation calculations between ASHRAE Standards 170 and 62.1; can anyone here help shed some light on it?

"This is the first time I am working on LEED for a hospital and I am not sure how the template wants me to show... Read more

Product Guide

Virgin materials can come with major environmental impacts from mining, petroleum extraction, or irresponsible logging practices.

BuildingGreen-Approved Site Furnishings

All approved products contain some post-consumer recycled content, with several boasting 90%–100% overall recycled material. Wood products are responsibly sourced... Read more

Quiz

Welcome to the quiz portion of Whole-Building Life-Cycle Assessment: Taking the Measure of a Green Building.

Learning Objectives
Upon completing this course, participants will be able to:


 

1. Define key concepts of whole-building LCA.
2. Recognize the inherent flaws, and potential gains, of whole-building LCA... Read more

Basic page

Testing web-to-lead to existing contact in Salesforce.

function timestamp() { var response = document.getElementById("g-recaptcha-response"); if (response == null || response.value.trim() == "") {var elems = JSON.parse(document.getElementsByName("captcha_settings")[0].value);elems["ts"] = JSON.stringify(new Date().getTime());document.... Read more

Forum topic

Hello SMEPers,

I’m hoping to crowd source some anecdotes for a guest lecture I’ll be giving at Yale’s architecture school. The topic is integrated design (especially between architects and engineers) and how it enables better sustainability outcomes.

John Boecker has this great story about how choosing a paint color with higher... Read more