×

Error message

  • The specified file temporary://fileUXJhCL could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://filePVQIen could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://fileVWX8h9 could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://fileLn7Tvd could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://file9lVP8b could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
BuildingGreen Report

Team Group

Forum topic

EDITED LINK

Hello, below is a link to our newly uploaded research report, Embodied Carbon in Commercial Furniture. This new research report introduces a case study and some new baselines for measuring the carbon footprint of commercial furniture, to add to a growing body of work on this topic among our peers:
Embodied Carbon in... Read more

Forum topic

Hi Everyone,

Who has worked on a SITES certification and can share the approximate hours involved for administering and completing documentation? A relative sense of the effort compared to LEED would also be helpful, similar to the thread about WELL on this same subject. 

Appreciate any insight. Thanks! -Hilary

Forum topic

Dear Colleagues,

I proposed CarbonCure for a project and the structural engineer in the meeting was opposed to it. He later sent me detailed reasoning by email. I have not used this technology and would like to hear other more experienced opinions on the technology. The project we are working on is well integrated with climate, 99% sDA,... Read more

Forum topic

SCL group,

I have aquaintances at a new startup called Dumptd that is launching a platform to make it easier to order waste solutions online while providing tracking and reporting options. They are looking for beta test projects. If you are interested, contact Clayton (below).

Thanks,

Scott

Dumptd is an early stage... Read more

Forum topic

Anyone know what stages does CARE include? Does it include B1-5, C1-4 or D?

Thank you!

Peer Network Event

Forum topic

Hi folks,

I’m sorry to be so last minute with this. LEED v5’s second public comment period ends TOMORROW (Monday, Oct 28). As it currently stands, LEED has eliminated its preferential support for FSC over other forest certification programs and is silent on climate-smart forestry.

I’m hoping that the Climate Smart folks in this... Read more

Forum topic

Attached are the raw notes from the Design Process Conversations.

And here are the Guiding Questions from the Agenda Survey:

Design Process: how to intervene to get better outcomes?

How do I crack the nut of making a difference within my firm in the Design Process?

What strategies alter our fast-paced design... Read more

Quiz

Welcome to the quiz portion of The Four Core Issues to Tackle for Resilient Design (And the Programs That Can Help).

Learning Objectives
Upon completing this course, participants will be able to:


 

1. Use site-specific hazard analysis to evaluate a project’s resiliency demands.
2. Use climate change data to... Read more

Forum topic

I'm looking to draft some one-page briefs for my consulting engineers to outline what we would like to see in their specs regarding certain materials and systems. For example, letting the plumbing and civil engineers know that we prefer to eliminate PVC pipe and want them to specify alternatives like Polypropylene, cast iron, ABS, etc. The idea... Read more

Forum topic

Hello all,

Could any of you point me out to recent studies showing the health impacts of plastic piping vs. copper piping? 

We have a project where NIRON or Aquatherm are proposed as a VE item in lieu of copper.  I know there is some studies showing PEX and PVC piping health impacts, but I can't seem to find anything on these 2... Read more

Product Guide

Wood decking requires potentially hazardous preservatives and stains, and plastic waste is a significant environmental problem.

BuildingGreen-Approved Decking

Composite decking approved by BuildingGreen has at least 50% total recycled content. For plastic decking, post-consumer content has to be greater than 50%.

Health and... Read more

Forum topic

Has anyone used Insight for Revit to document the LEED Daylight Credit If so, would you recommend it?

Thanks,

_Ilana

Forum topic

Can you comment on successful ways you have used eQUEST and pitfalls you have seen? We are considering training our architects to use it for early building analysis on all projects. 

Quiz

Welcome to the quiz portion of The Value of Variability.

Learning Objectives
Upon completing this course, participants will be able to:


1.  Understand why variability is important to the comfort and well-being of building occupants.

2.  Define “alliesthesia” and explain how it relates to the well-being of occupants... Read more

Reports, Courses, Study Guides, Live Webinars

ON SALE NOW - for a limited time, get the Guide for $69.00

If you are interested in sharing this guide within your organization and adding a copy to your library, please purchase the guide's site license. The site license permits the purchaser to share the PDF Guide file within their company/organization and post it on their... Read more

Forum topic

Columbia already offers access to free EV charging for our field employees. Of the few projects that have have opted in so far, we've had to custom design and intall EV charging setups. It's good that we're doing this, but it won't scale quickly enough and cost effectively.  I think a practical next step is working with trailer companies so... Read more