Forum topic
The Water Sub-Group met today. This group is working on three items:
1. Project Water Plan Template
2. Project Water Tracking Form Template
3. Research and Resources Document
The Meeting minutes are attached. The next meeting is 5/19/20 @ 2:30 PM CST, via webex and teleconference. Please contact me if you would... Read more
Forum topic
Does anyone know where one can locate weather files (EPW) that has predicted future data for climate change?
Thanks in advance.
Forum topic
My dear collegues,
As I'm sure is true for many of us, the events of the past weeks (months/years/decades...) have emphatically reinforced to me the need for a radical shift in how we meaningfully address JEDI in what we do. One (admittedly small) step I've been thinking about are the statements of reconciliation that have become more... Read more
Forum topic
Hello All,
ASHRAE and ICC released a draft standard for operational and embodied GHG evaluation. It's on a fast track to be completed in time for the next code cycle. This 30 day advisory draft includes dozens of questions looking for feedback from experts like all of you. Please take a look and provide comments. I've uploaded the... Read more
Product Guide
More sustainable forms of transportation are a key component of green building design and resilient communities.
BuildingGreen-Approved Bike Storage
BuildingGreen approves bike racks that offer security, integrated weather protection, or efficient use of space. Some products may also feature recycled content or powder-coated... Read more
Forum topic
Hello everyone,
Over the past couple of years the Climate Smart Wood Group has met monthly to discuss all things related to the use of timber in building design and construction. From forestry practices, to supply chain and sourcing information, to design experiences and examples, the group has operated as an open forum for advancing... Read more
Forum topic
We are looking at installing an aerobic biodigester in a commercial kitchen for an office client that is VERY concerned about zero waste. Basically, this system takes food waste, treats it with micro-organisms to remove organic matter, and turns it into water of high enough quality to go straight to the sewer. The manufacturer we are looking... Read more
Product Guide
CEUs are available for reading all the building-envelope product guides and primer. Click here to learn more and take the quiz.
Vapor retarders are meant to protect our building assemblies from getting wet, but they can also slow drying, contributing to mold and structural degradation.
BuildingGreen-Approved Vapor Retarders
... Read moreForum topic
Hi SDLs,
Do you have design experience or a unique perspective on trying to include ungendered multiuser restrooms in AEC projects? We want to hear from you.
To prepare for a co-creative workshop as a part of the Environmental Design Research Association's 53rd Annual Conference, "Health in All Places," B. Sanborn, Nicole DeNamur... Read more
Forum topic
All,
We are collecting examples of buildings that involved electrification initiatives (building does not need to be all electric as long as largely electric). Please share your projects with us through this short survey. It will take 8-10min to complete.
The study will culminate into a report and best practices to advocate for... Read more
Forum topic
We have an increasing number of projects, where the client is coming to us with "net zero" aspirations and plans, some of which don't fit the typical all-electric, grid-tied building that produces 100%+ of its annual energy use on-site. There include examples like:
1) A (targetd) living building that maximizes on-site production, with... Read more
Forum topic
Anyone has experience with CertiPUR-US? I’m having a hard time finding assurance documentation for foam padding for seating.
I would appreciate any feedback or experience on CertiPUR-US program or any recommendations on product.
Quiz
Welcome to the quiz portion of Reexamining Priorities in Green Building.
Learning Objectives
Upon completing this course, participants will be able to:
1. Define green building priorities from a few different angles (separating process priorities from outcome priorities).
2. Differentiate those priorities... Read more