Forum topic
Hello to all,
Are you familiar with examples of commercial kitchens using all induction / all electric cooking, without gas or other fossil fuels?
For a dining hall for 1800 students, we are interested in precedents.
Thanks!
Tamar
Forum topic
Hello Green Gurus,
I'm excited to share another Peer Networks webinar we have on deck for August, coming up next week!
Register HERE.
“How Good is this Product?” - Multi-Attribute Assessment of Products and Product Selection Management Tools
Thursday, August 19th, 2021
12pm - 1pm ET (9am - 10am PT)
... Read more
Forum topic
We just had a planning call for the tour, and I’m more convinced than before that: a) we picked a great location for this year’s Winter Summit and b) you won’t want to miss this tour!
Alabama’s Gulf State Park got a big infusion of funds from the BP Oil Spill (that’s an interesting story in itself), and now has some amazing new... Read more
Forum topic
Hi folks,
You may have seen this posted to the Green Gurus forum. Paula got some good responses from architects and engineers, but not so much from GCs so she asked me to follow up and post it here. Please reach out to her if you're willing to be included in these articles/reports. Thanks!
Hi! I’m working on two reports about... Read more
Forum topic
I'm writing an article surveying and comparing various embodied carbon tools, including whole-building LCA tools. I'm looking for interviewees who have used at least TWO of the three major LCA tools currently in use in North America (Tally, Athena IE, and One Click LCA). If you've tried all three, all the better! If you or someone in your firm... Read more
Product Guide
An induction range capable of replacing a standard gas range offers the potential of significantly reducing the energy required for ventilation in a commercial kitchen and improves IAQ at home.
BuildingGreen-Approved RangesWe look for commercial-scale as well as residential induction cooktops and ranges designed to reduce indoor... Read more
Forum topic
Hi Everyone,
This is quite last minute (due tonight) but please see below for an opportunity to email comments to EPA supporting national building material reuse measurement/methodology. Submission is easy, just a short email supporting C&D/reuse and any other thoughts on what to include/exclude in material pathways for reuse beyond... Read more
Forum topic
Hello all,
I need future weather files for a project. We are looking at three years, 2050, 2075, and 2095 using two climate change scenarios, low emissions, and high emissions. I have seen ARUP's Weathershift site that uses RCP 8.5 and RCP 4.5. Are we assuming that 2.6 is not achievable? I would have used this as a low emissions scenario... Read more
Forum topic
Hi all,
Thanks again to those who presented at the AIA Show & Tell! Here are the slides for some of the fascinating presentations we saw. Please do not share the slides outside of the networks unless they are marked “PUBLIC.”
There may be more to come; if you presented but did not yet provide permission for your slides to be... Read more
Forum topic
We have all these resources out here in the ether but it’s so hard to pull them into one spot! I was asked, last minute to join a client call today to help convince both the client (affordable housing developer) and the mechanical engineers to "stick with" a commitment to 100% electric design that was publicly stated when the competition was... Read more
Quiz
Welcome to the quiz portion of No More Red Lines: Undoing Our Legacy of Urban Segregation.
Learning Objectives
Upon completing this course, participants will be able to:
Quiz
Welcome to the quiz portion of Natural Ventilation: The Nine Biggest Obstacles and How Project Teams Are Beating Them
Learning Objectives
Upon completing this course, participants will be able to:
1. Explain the primary reasons to design a building for natural ventilation.
2. Understand how cost, comfort... Read more
Forum topic
On LEEDuser we divide checklists into multiple project phases. Specifically:
Before the performance period Construction Construction documents Design development During the performance period Operations & maintenance Pre-design Schematic designHow many of these phases are relevant for BIT best practices?
Note that we also... Read more
Forum topic
Hello all,
Wondering if anyone has experience with lead limits in electrical cable and wiring?
LEED for Healthcare allows a limit of 300 ppm of lead in electrical wire and cabling - my search for compliant products has been all dead ends. (MRc PBT Source Reduction - lead, cadmium, and copper)
Acceptable regulations for... Read more
Peer Network Event
Forum topic
Hi all,
We are looking to study Passive House on a couple small multifamily projects. Our understanding is that WUFI Passive only integrates with SketchUp at this time. Our BIM manager has been trying to find an example of a firm that works in Revit and uses WUFI Passive, to point him in the right direction on workflow. I offered to ask... Read more
Forum topic
I'm working with a project team that is looking into bird control options to prevent nesting/roosting/pooping on the scrim that is designed to scrim their building's facade. They are looking at electrified tape, repellents, laser systems, etc -- Options that don't dramatically impact the building design. The products they're looking at claim... Read more
Forum topic
Hello Green Gurus,
A close colleague of ours, Frances Yang of Arup, is distributing a survey developed in partnership with the Healthy Building Network (HBN).
The survey asks for which product categories you need more health information. Answers will help inform which product categories HBN next incorporates into its HomeFree and... Read more