×

Error message

  • The specified file temporary://fileikpKpN could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://fileIAVWRa could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://fileHA2Sqj could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://filenJpllv could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://file0PWhHU could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
BuildingGreen Report

Forum topic

Friends, I'm helping with the 2023 COTE Top Ten Award and would love some input from this group on 2 things: 

1) Now that the AIA Design Excellence awards use the Framework for Design Excellence as their entry criteria, what do you see as the next gen for the Top Ten? If you could change 1-3 things, what would they be? If you submitted... Read more

Reports, Courses, Study Guides, Live Webinars

Note: This webinar is complete and registration is closed.

Join us for a live sneak preview of our Top 10 Green Building Products for 2021. Our team has selected them from thousands on the market—this year with a focus on carbon and global warming. Products & Materials Specialist Brent Ehrlich will walk you through why we chose... Read more

Forum topic

Hi, all. We missed you at the standing check in today. We have a couple of questions for the BG team:

1. What is the timing criteria you need for Best Practice content? We need to back into a deadline on submissions and believe your critical path timing will help define ours.

2. Can you elaborate on what LEED User/BG content may... Read more

Forum topic

Who all is implement 360-degree reviews as part of their employee review process?  Lake|Flato is thinking of implementing this and would like to talk to a few other firms who have experience they would be willing to share.  Please contact me if you'd be up for a short email discussion or phone call to discuss.  hholdridge@lakeflato.com

... Read more

Forum topic

We are growing our Design Performance Group at NBBJ! We're looking for two special people right now: a senior sustainable material consultant and a senior energy analyst. Help us design the next generation of healthy, low impact buildings - this is a chance to impact across the scale of our global company and build a better future! Know anyone... Read more

Forum topic

Hello SCL,

Quick reminder to sign up for our SCL Summit in May! True to usual form, we ask what’s important to YOU before we finalize an agenda. In the next couple of weeks, we will be sending out a draft agenda and asking for your feedback. Sign up now so your voice will be heard. Initial ideas so far have included:

Refining our... Read more

Forum topic

Hi folks -

I was contacted last week by the producer of the documentary that launches this Thursday, 12/10 - he is hoping to generate interest among folks across the environmental spectrum (which of course includes all of us!) so I am sharing his pitch below with you all. The subject of water scarcity and drought is only going to... Read more

Forum topic

Hi everyone,

I’d like to invite you to join this Friday’s webinar hosted by the Embodied Carbon Network: Using Whole Building LCA to Reduce Embodied Carbon within LEED and Beyond, and to follow up with a tool that I presented at this summer’s Architecture SDL summit, which ZGF has now upgraded and made free to the industry at large.... Read more

Forum topic

What’s the net present value of that extra insulation? Join us on Tuesday, June 25th at 2:00 pm Eastern for a Peer Networks webinar on “Balancing Embodied and Operating Carbon.” Bill Smarzewski and Jason Fierko of Ewing Cole have developed a method for combining energy modeling with embodied carbon data to determine the carbon “payback” of... Read more

Quiz

Welcome to the quiz portion of New Concepts in LEED v4.

Learning Objectives
Upon completing this course, participants will be able to:


 

1. Recognize the ways in which the Integrative Process credit requires teams to analyze opportunities early in design.
2. Describe how the new Location and Transportation... Read more

Forum topic

A colleague of mine from another firm is seeking a good sustainability consultant in North Carolina. I haven't done work in that part of the country so I'm wondering who you all would recommend.

Thanks,

Carolyn Day

Forum topic

At the summit we discussed sharing which consultants our firms have used for anti-bias training and EDI education. My office will participate in the upcoming AIA Seattle pilot Intercultural Leadership Program, but that only includes two of our firm leaders. If anyone can refer a consultant in the Seattle region for all-office trainings, I'd... Read more

Forum topic

I am looking for examples of police stations and fire stations that are operating at an ENERGY STAR or better level.  Google searches have not provided much to go on - I found one net zero energy police station (Cincinnati Police District 3 West Side).  Curiously, Justice Facilities Review write ups do not include details about energy... Read more

Product Guide

The overwhelming majority of wallcoverings are flexible vinyl, laden with all the life-cycle concerns that come with PVC. Products used to contain orthophthalate plasticizers—which make up a large percentage of these products. Phthalates are not bound in the material and can slough off in dust, exposing occupants during everyday work or play.... Read more

Forum topic

I've been seeing Armstrong's DC flexzone ceiling system at Greenbuild for many years. I'm working on a net zero project with LED lights and solar panels. In theory, the transmission losses in going from DC power from panels to AC for the building to DC for the lights would be eliminated. But does anyone actually have experience using this... Read more

Forum topic

All,

Some of my colleagues and I have been working to promote interest in mass timber construction for K-12 builidngs.  As part of that effort we redesigned a large high school using mass timber in lieu steel, and conducted a whole building life cycel assessment to measure the reduction in embodied carbon.  We also conducted a program-... Read more