Forum topic
Hi,
Has anyone been asked by a client to track welding rods on any projects? We were recently asked to do this. I was asked why the client would ask us to do this. I don't know if it has to do w/ "real property" and is a property tax-related reason, or if it is an environmental/sustainable reason. There is piping associated with the... Read more
Forum topic
Hello Green Gurus,
Here is the information for December's Peer Networks Webinar, Architects in the Blue Zone: The AIA at COP26. We hope you will join us!
Register HERE
Architects in the Blue Zone: The AIA at COP26
Wednesday, December 15th, 2021
4pm - 5pm ET (1pm - 2pm PT)
Description
The American... Read more
Forum topic
Reminder: For anyone interested in continuing to participate in the Climate Smart Wood Working Group, please note that we have joined the other CSWG and will have our first meeting next Wednesday. Visit the Working Group page for the meeting invite and agenda.
Forum topic
Hi all,
I've been working on a LEED project in California for months and our energy modeler wants to use the LI 10480 Title 24 2019 pipeline to demonstrate compliance under LEEDv4. Only problem is, I've never done it that way before, and our modeler and I are consistently speaking in different languages. Anyone done a project under this... Read more
Forum topic
Hi MEP Leaders!
Here's a reminder that our monthly meeting is coming right up--today at 2:00 pm ET.
There is a lot to talk about: James has put together a starting point for our "how to make the best use of your engineer" guide. And Summit plans...
You can view the agenda here.
All members of the SMEPL network are... Read more
Forum topic
Not to distract from Tanya's post, but we too have a new opening for a Sustainability Specialist in our Dallas office. If you know anyone...https://careers-pagethink.icims.com/jobs/1254/sustainability-specialist/job
Forum topic
Good morning all!
We're working on a higher ed project, and the university PM recently read an article about eco-friendly drywall and is interested in using it on the project. We're currently using the USG EcoSmart drywall on another project and mentioned it as an option, but the article she forwarded also mentioned ExtremeGreen's MgO... Read more
Forum topic
Does anyone know of reports/studies of financial benefits from the developer perspective on Passive House multifamily projects? Specifically looking for market rate (not affordable) housing examples where there is a direct market advantage (higher rents) for PH buildings.
Forum topic
Hey, everyone! Many of you on this forum have probably already RSVP'ed but I wanted to put a plug out there for the happy hour event on the evening of November 2nd at our office in San Francisco.
The event is co-hosted by Architecture 2030 and national and local AIA COTE. There will be food, drinks, great people, and a chance to preview... Read more
Product Guide
Water treatment systems often rely on harsh chemicals to treat bacteria, and on high water use from drawdown of water to reduce build-up of concentrates—a process called blowdown.
BuildingGreen-Approved Water Treatment
BuildingGreen approves systems that:
work on proven scientific principles and are supported by strong track... Read moreForum topic
https://www.architects.org/awards/sustainable-design-0
All,
My BSA Co-chair, Steven Burke, and I want to make you all aware of the BSA Sustainable Design Awards coming up soon. Please see the above link for qualifications and registration information. This is an award which is attempting to work towards the same stringency, rigor... Read more
Forum topic
We have an increasing number of projects, where the client is coming to us with "net zero" aspirations and plans, some of which don't fit the typical all-electric, grid-tied building that produces 100%+ of its annual energy use on-site. There include examples like:
1) A (targetd) living building that maximizes on-site production, with... Read more
Forum topic
All,
We are collecting examples of buildings that involved electrification initiatives (building does not need to be all electric as long as largely electric). Please share your projects with us through this short survey. It will take 8-10min to complete.
The study will culminate into a report and best practices to advocate for... Read more