BuildingGreen Report

Forum topic

The 2018 ENR Green Building Survey is due March 16th.  I'm sure you all know the metric they use to evaluate your ranking is solely the revenue from projects pursuing a green building certification in the previous calendar year.  Personally, I think this totally bogus.  How "green" a contractor is may correlate with how much revenue they have... Read more

Forum topic

Currently, the BIT User site is fully accessible without having to log in (unless you want to edit or add content, of course). The time has come, however, to start restricting access only to logged-in users.

Which sections will be freely visible, and which will be visible only to registered users? Here's what I recall from our earlier... Read more

Forum topic

Hello everyone,

Here's a reminder that our call for this month will be taking place next Tuesday, November 12th at 2:00pm EST.

Please feel free to join us!

Join Zoom Meeting:

https://zoom.us/j/248664490

One tap mobile
+16699006833,,248664490# US (San Jose)
+19292056099,,248664490# US (New York)... Read more

Forum topic

All, today is the day I had committed to sending out the DRAFT request to equipment manufacturers of what is needed for full electrification.  I apologize that I didn't have time or focus to get my thoughts together till now (I had intended to share this with Chris and others prior to sending to the full group, but just didn't get my thoughts... Read more

Forum topic

Does anyone know about temporary flushout equipment that could be used to augment a building's systems to get additional CFM of OA during construction?  For our non-laboratory type projects the flushout period ends up being too long, especially in either humid summers or frigid winters (Pennsylvania).

Hoping that some of you on either... Read more

Reports, Courses, Study Guides, Live Webinars

THIS WEBINAR PURCHASE AND REGISTRATION IS CLOSED.

HPBA Control Layers – It’s in the details Tue, Sep 11, 2018 2:00 PM - 3:00 PM EDT (11:00 AM - 12:00 PM PT)

Why high-performance assemblies? And why now? Today we demand better thermal performance from our building assemblies than ever. But higher performance... Read more

Forum topic

A question for you, all input appreciated: What are some metrics and data points you all use to report out to your staff and leadership? I'm starting on higher-level analysis of our projects' performance by typology and through other lenses, and I wonder if you have found metrics or reporting points that are particularly impactful in your... Read more

Forum topic

Hi everyone, 

Thank you so much to the SDL members who attended the Summer 2023 Summit! We had an amazing time with you there. A big thanks as well to the attendees who shared 5-minute presentations during the summit.

Below are some of the slides for the presentations. Please note that we have permission from all of these... Read more

Author

Opal Mao Mannella-Durante

Product Guide

CEUs are available for reading our entire plumbing guide. Click here to learn more and take the quiz.

Excess heat generated by air conditioners, refrigerators, boilers, and water flowing through pipes typically goes unused.

BuildingGreen-Approved Water Heat Exchangers

BuildingGreen lists desuperheating technologies and... Read more

Forum topic

Hi Fellow SDLers: Just wanted to make sure everyone saw the terrific initiatives that the White House announced last week:

https://www.whitehouse.gov/ceq/news-updates/2021/05/17/fact-sheet-biden-administration-accelerates-efforts-to-create-jobs-making-american-buildings-more-affordable-cleaner-and-resilient/

Maybe some impact from... Read more

Forum topic

Well done and rivhly deserved, brother.  That makes you a Fellow Squared.

Campus-wide Group

Quiz

Welcome to the quiz portion of Changing Building Design Priorities for a Changing Electrical Grid!

Learning Objectives
Upon completing this course, participants will be able to:


Define a “Highly Variable Renewable Energy” generation asset, or VRE, and understand how VREs can most effectively contribute to the... Read more

Forum topic

Hi everyone,

Just a reminder to please fill out the SDL 2024 Events Attendance Poll by the end of next Monday, December 18th. Thank you so much to those who have filled it out already! :) 

-Amanda

Forum topic

Hi Gang, 

We are looking to implement the contractor commitment and are running into COVID-19 protocol barriers when looking at the Jobsite Wellness category specific to the soap as well as the food storage/eating areas on site. Anyone else run into this issue? 

-Kena 

Forum topic

Anyone else having this experience? We've got a LEED 2009 Core/Shell project that we've now been contracted to do a fitout within for one of the first tenants. If anyone else has had this experience and is willing to talk with me about how your process for it has gone, I'd be fantastically grateful.

Find me directly at awilson@asg-... Read more